Northrop Grumman-built Amphibious Dock Ship

Tuesday, July 01, 2008

The Northrop Grumman Corporation-built amphibious transport dock ship (LPD 20) completed builder's trials last week, a collaborative effort between the company's Shipbuilding sector and the U.S. Navy.   Northrop Grumman Shipbuilding, the newly-formed sector of  Northrop Grumman Corporation, is made up of the former Northrop Grumman Ship Systems and shipbuilding sectors.  Rigorous testing was performed on the ship's main propulsion, communications, steering, navigational, radar and other systems. Other exercises included anchor handling, flight operations, compartment air balancing and ballasting/de-ballasting of the well deck, where amphibious landing craft will be launched.
Later this month, the U.S. Navy's Board of Inspection and
Survey team will conduct acceptance trials aboard LPD 20, which will involve more rounds of extensive testing of the ship's major systems.'s mission is to embark, transport and land elements of a landing force in a variety of expeditionary and special operations missions. is an LPD 17-class ship. The ship is 208.4 meters (684 ft.) long, 31.9 meters (105 feet) wide, and will replace the functions of the LPD 4, LSD 36, LKA 113, and LST 1179 classes of amphibious ships. This new ship class affords the Navy's Expeditionary Strike Group with the technology and flexibility to launch and recover amphibious landing craft such as the Landing Craft Air Cushion, operate an array of rotary-wing aircraft, as well as carry and launch the U.S. Marine Corps' Expeditionary Fighting Vehicle.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

ONR Funds UW Oceanographic R/V Refit Contract

The US Department of Defense informs that the University of Washington (UW), Seattle, Washington, is being awarded a $12,776,050 cost reimbursement contract for

Navy, Other Agencies, Award Bio-refinery Contracts to 3 Firms

As part of a 2011 Presidential directive, the Departments of Navy, Energy, and Agriculture have announced that three companies have been awarded contracts to construct

AN/SPY-1 SSSA Completes Critical Design Review

The Critical Design Review (CDR) stage for AN/SPY-1 radar Solid-State Switch Assembly (SSSA)'s high voltage modulator completed Aug. 26, confirming that the

 
 
Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1597 sec (6 req/sec)