Northrop Grumman Redelivers USS Enterprise

Wednesday, April 21, 2010
Photo courtesy Northrop Grumman

Northrop Grumman Corporation (NYSE:NOC) redelivered the world's first nuclear-powered aircraft carrier, USS Enterprise (CVN 65), to the U.S. Navy. The redelivery follows the completion of an Extended Drydock Selected Restricted Availability (EDSRA). The project is the ship's last dry docking before deactivation and was performed by the company's Shipbuilding sector in Newport News, Va.

"Enterprise is an extremely complex ship that required an extraordinary effort on the part of the shipbuilding team and the ship's crew to get her through the availability and back in the fight," said Capt. Ron Horton, Enterprise's commanding officer. "The relationships that were built between my crew and the shipbuilding team will last a lifetime. This truly was an amazing performance by everyone, and it has been the highlight of my career to have been a part of it."

The carrier, which departed for sea trials on April 17, returned to Naval Station Norfolk today flying a broom on its mast to signify a clean sweep and a successful sea trial. Sea trials are conducted to test systems, components and demonstrate operations at sea. The trials also include high-speed runs and a demonstration of the carrier's other capabilities.

Work during the EDSRA included dry docking work, tank blasting and coating, hull preservation, propulsion and ship system repairs and limited enhancements to various hull, mechanical and electrical systems. USS Enterprise is the world's first nuclear-powered aircraft carrier and the only ship of its class. It was built by Newport News and joined the U.S. Navy's fleet in 1961. Northrop Grumman has been responsible for accomplishing the majority of scheduled and emergent maintenance on USS Enterprise since 1994.

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Pre-Mooring Safety Inspections at Trieste, Italy

The SIOT/TAL Terminal at Trieste has advised that the TAL Pre-Mooring Safety Inspection program will be modified from 1 September. The checks at road will affect:

Hornbeck Offshore Ride High on Q2 2014 Results

Hornbeck Offshore Services, Inc. has announced its financial results for the second quarter ended June 30, 2014.  Following are highlights for this period and excerpts

USCG Cutter Waesche Home from RIMPAC Exercises

The Coast Guard Cutter Waesche has returned to port at Coast Guard Base Honolulu, after spending three weeks at sea participating in Rim of the Pacific (RIMPAC) 2014 exercises,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Port Authority Salvage Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1734 sec (6 req/sec)