Northrop Grumman Successfully Tests Low Observable Multifunction Stack

Tuesday, November 27, 2001
Northrop Grumman Corporation's Ship Systems sector has successfully tested the Low Observable Multifunction Stack (LMS) designed to demonstrate two different advanced exhaust suppresser systems for surface combatants.

The exhaust systems, enclosed in a low signature composite structure, also integrate embedded multifunction communication arrays. The combination of these different technologies into a single, integrated low observable composite structure is advancing the military effectiveness of future surface combatants, according to Richard Schenk, president of Ship Systems' Full Service Center.

"This integrated approach will help provide increased connectivity necessary for modern warfare while avoiding the mass of communications antennas that typically cover the topside of surface combatants," said Schenk.

The project was sponsored by the Office of Naval Research through its Advanced Technology Demonstration (ATD) program. Northrop Grumman Ship Systems has been an active participant and ship system integrator on every ATD program related to Topside Integration. Execution management of the project is provided jointly by the Naval Sea Systems Command and the Space and Naval Warfare Command (SPAWAR).

"The success of the LMS ATD could not have been achieved without the excellent cooperation between the Navy and Northrop Grumman, and specifically without the efforts of Ron Wilson, the Northrop Grumman program manager, and his team of engineers and craftsmen," noted Bill Bird, Navy technical manager from the Naval Surface Warfare Center, Carderock Division (NSWCCD).

Construction of the LMS was completed at the Northrop Grumman Ship Systems Avondale Operations composite facility in Gulfport, Miss., in July 2001.

After completing construction, the LMS structure was barged to Ship Systems' Ingalls Operations' East Bank facility in Pascagoula, Miss., for final fit-out, and land-based testing of its Radar Cross Section (RCS). The RCS testing was performed at the Ship Systems Near Field Radar Reflectivity Range (NFR3) facility. The newly constructed NFR3 facility provides the capability to measure the radar reflectivity of large structures accurately and with high resolution. The LMS RCS testing was conducted over a two-week period with radar instrumentation provided by NSWCCD.

"The NFR3 facility was instrumental in demonstrating the performance of the LMS and greatly reduced the potential cost of testing at other East or West Coast facilities," stated Ross Buck, engineering project manager and Ship Systems Radar Range Test director.

After RCS testing, the LMS structure was installed on an Ex-Asheville class patrol gunboat for additional testing at-sea near Panama City, Fla. The additional tests included at-sea signature measurements of the LMS and tests of the communication capabilities of the antenna systems embedded within the LMS structure. "The LMS project team is to be commended for advancing the state of the art and building a strong foundation for future Topside Technology," said Mr. Bird. The team includes U.S. Navy participants from the Naval Warfare Centers, the Naval Postgraduate School and SPAWAR along with industrial partners Ball Aerospace and Communications, Boeing Aerospace and Northrop Grumman Ship Systems.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Inchcape Shipping Celebrates 25th Anniversary of ISS Greece

Inchcape Shipping Services (ISS), the world’s leading maritime services provider, has this month celebrated the 25th anniversary of its operations in Greece

Steel Cut for Third RCI Quantum-class Cruise Ship

The steel cutting for 'Ovation of the Seas', scheduled to be delivered in the autumn of 2016, took place at the Meyer Werft shipyard in Papenburg, Germany, where 'Quantum of the Seas',

Holland America Line's New Ship is ms Koningsdam

Holland America Line revealed the name of its new 99,500-ton cruise ship slated for delivery in February 2016 will be ms Koningsdam. While the name pays homage

Navy

Ingalls Authenticates Keel on Aegis Destroyer

Huntington Ingalls Industries' (HII) Ingalls Shipbuilding division today authenticated the keel for the company's 30th Aegis guided missile destroyer, Ralph Johnson (DDG 114).

Today in U.S. Naval History: September 23

Today in U.S. Naval History - September 23 1779 - Capt. John Paul Jones in Continental Navy frigate Bonhomme Richard captures HMS Serapis. 1931 - Lt. Alfred

MSC Award Two Time-Charter Contract Modifications

The US Department of Defense informs that Offshore Service Vessels, Inc., and Sealift, Inc., have each been awarded time charter option extensions by the US Navy's

 
 
Maritime Careers / Shipboard Positions Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1871 sec (5 req/sec)