Norway Extends Oil Cutback To Q1 2000

Friday, December 10, 1999
Norway, keeping in step with OPEC, will extend a 200,000 barrels per day (bpd) curb to oil output to the end of the first quarter of next year. Norway's Oil and Energy Ministry said it was extending the cuts beyond December 31 even though oil prices have more than doubled since late 1998. "Norway's oil production will be reduced by 200,000 barrels per day in the first quarter 2000," it said in a statement. Norway produces about 3.0 million bpd and is one of the world's top exporters behind Saudi Arabia. It first introduced a restriction of 100,000 bpd in May 1998 and doubled the cut to 200,000 bpd from April 1, 1999. Both OPEC and non-OPEC oil producers implemented production curbs after oil prices fell to historic lows below $10 per barrel. Prices have since recovered back to around $25. Oil Minister Marit Arnstad said that the strong prices had largely reflected expectations of a tighter market rather than any actual supply shortfall. "We would also like to see how the uncertainties affect the market, the seasonal demand and Iraqi exports," she said. "I think oil prices might go even higher." "I also think that during the first half of 2000 there will be a need for both OPEC and independent producers to consider what is sustainable and a stable price level," Arnstad said. "I do see a danger of prices going too high." Some oil market observers have been skeptical of Norway's cuts, saying they were only paper measures since delays to new projects and technical problems at some fields had left it unable to meet forecast production for 1999. Arnstad said that output in 1999 would be around 2.95 million bpd or "maybe even a bit lower," under the forecast of 2.99 million bpd including the reduction. "We cut from what is the best estimate we have of future production on the Continental shelf, that is the only way Norway can operate these cuts," she said. State oil company Statoil said there was "some flexibility" in the system. If output was less then expected at one field then another Could pump more. Norsk Hydro, the second largest operator in Norway, also said it had not been necessary to restrict output at any of its fields.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter February 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Nordana Sea Delivered to Symphony Shipping

After successful sea trials, M.V. Nordana Sea was delivered to Symphony Shipping on February 11, 2016. Constructed by builder Ferus-Smit in the Netherlands (yard number 419),

James Troop Supplies Engines for 3 Naval Vessels

Liverpool City Region (UK) based ship engine specialist James Troop & Co has won an order to supply Volvo Penta diesel engines for three European naval vessels being built on Merseyside.

OSV Delivered to MC2 in Dubai

Marine Core & Charter LLC (MC2) headquartered in Dubai has taken delivery of the new build PETRA-1, the first of two, 45-meter Fast Offshore Support Vessels in

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0754 sec (13 req/sec)