Oceaneering Announces Hurricane Damage Services Contracts

Wednesday, May 02, 2007
Oceaneering International, Inc. won two contracts from BP Americas Production Company (BP) to provide vessel and remotely operated vehicle (ROV) services in the Gulf of Mexico (GOM) to support hurricane damage-related platform decommissioning operations. Under terms of each contract, Oceaneering will provide a dynamically positioned ROV support vessel equipped with three ROVs -- two work class and one observation class. The vessels will be the Ocean Intervention III, formerly named the Island Ranger, and the Maersk Attender. Both contracts have initial terms of one year and commence May 2007 and June 2007, respectively. At the end of the initial terms, BP has two consecutive one- year options to extend these contracts.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

New AVEVA ISM Bridges the Gap

AVEVA launches a new application for governing asset information using a standards-based methodology. AVEVA announced the launch of AVEVA Information Standards Manager (AVEVA ISM),

General Dynamics gets $25 mi GPS Contract from Lockheed Martin

General Dynamics Advanced Information Systems, a business unit of General Dynamics, was awarded a $25.4 million full-production contract from Lockheed Martin to support the U.

Globecomm to Provide VSAT for PBJV Barge

Purpose-built accommodation and pipe-lay barge on charter to Petronas equipped with VSAT and L-Band services. Globecomm Maritime has been awarded a contract

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1472 sec (7 req/sec)