OceanFreight Announces Long-Term Time Charter

Monday, July 21, 2008

OceanFreight Inc. announced that it has entered into a time charter contract for the Panamax dry bulk carrier, M/V Augusta, at a gross rate of $42,100 per day for a period of approximately three years. This contract is expected to generate about US$46 million of gross revenues over the term of the charter. The charter is expected to commence in direct continuation from her present T/C expected on or about in January 2009. M/V Augusta is a 69,053 dwt Panamax dry bulk carrier built in 1996.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

LNG: Did the Greeks Get it Wrong?

In December 2013, Alibra’s market report front page read: “When in shipping, do as the Greeks do.” At that time, Alibra was referring to the fact that 31% of the

Kerry to Press ASEAN meeting for talks on SCS Disputes

U.S. Secretary of State John Kerry will urge Southeast Asian nations in meetings in Laos next week to find diplomatic ways to launch talks with China on easing

US Navy Tests Latest Aegis Weapon System

The U.S. Navy conducted a series of cooperative air defense test exercises with the Spanish navy that culminated in live missile firing events using the latest Aegis Weapon System baseline July 20-21.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0898 sec (11 req/sec)