Odense to Build Carriers for Carras Hellas Group

Thursday, August 30, 2007
Odense Steel Shipyard Ltd. (Odense Staalskibsværft A/S) has concluded contracts with Carras Hellas Group, Greece, for a series of newbuilding Capesize bulk carriers. This new 180,000 dwt design has been developed between Odense and Carras with deliveries beginning in 2009. These orders, which will be built in the largest dock at the shipyard will, together with existing orders, fill up the capacity of Odense Steel Shipyard into 2010.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

New Research Vessel Delivered on the Great Lakes

The new oceanographic research and fisheries assessment vessel, Arcticus, completed her sea trials and was delivered to the U.S. Geological Survey's Great Lakes Science Center on October 17.

US Navy Christens Future USS Detroit

The U.S. Navy christened the future USS Detroit (LCS 7), the fourth Littoral Combat Ship of the Freedom variant, in a ceremony at Marinette Marine Shipyard in Marinette, Wisconsin, Oct.

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pipelines Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1023 sec (10 req/sec)