Odense to Build Carriers for Carras Hellas Group

Thursday, August 30, 2007
Odense Steel Shipyard Ltd. (Odense Staalskibsværft A/S) has concluded contracts with Carras Hellas Group, Greece, for a series of newbuilding Capesize bulk carriers. This new 180,000 dwt design has been developed between Odense and Carras with deliveries beginning in 2009. These orders, which will be built in the largest dock at the shipyard will, together with existing orders, fill up the capacity of Odense Steel Shipyard into 2010.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

LNG Vessel with Wartsila Integrated Solutions Delivered to Evergas

The first in a series of 27,500 cbm 'Dragon' class vessels ordered by Evergas, a world renowned owner and operator of seaborne petrochemical and liquid gas transport vessels,

Keel Laid for Russia’s Next Generation Icebreaker

The world’s biggest nuclear-powered icebreaker keel laying ceremony took place of at the Baltic Shipyard on 26 May 2015. Heads of Atomfflot, the Baltic Shipyard

Wärtsilä Bags BWM Systems Order from Jinhai Shipyard

Wärtsilä Corporation, has received an order for ballast water management systems (BWMS) for three new container ships being built for a major European shipping

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Port Authority Salvage Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3396 sec (3 req/sec)