Offshore Drilling to Expand in Gulf

Tuesday, March 07, 2006
According to Newhouse News Service, energy companies find the Gulf of Mexico lucrative and are investing even more to tap further into its potential, despite the threats of hurricanes. Six months after Hurricane Katrina, Gulf oil production is still down 25 percent and natural gas is down 20 percent. More than 100 platforms were destroyed and almost 200 pipelines were damaged by the storm. But Newhosue News Service reported that all indications point to the Gulf of Mexico rebounding from the storm's effects by the end of this year and that companies were seeking to expand. Shell has plans to spend part of its $15 billion exploration budget this year in the United States. BP plans to spend about $2 billion a year through the end of the decade on exploration. And, among other projects, Chevron has recommitted to spending $900 million to develop its Blind Faith field in the Gulf. The Minerals Management Service estimates there are 71 billion barrels of oil reserves in the Gulf, 56 billion of that in its deeper waters. That could rise if the eastern Gulf of Mexico is opened for drilling. By the end of the year, the agency estimates, about 2 million barrels of oil a day will be produced in the Gulf, compared with the 1.5 million barrels a day that companies produced before the storms last year. Production is expected to stay at that record level for at least five years. Gas production, however, isn't expected to make significant gains in the next few years. However, because of high demand for there may not be enough people, rigs or boats available to reach those estimated production amounts. (Source: Newhouse News Service)
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

SAL Heavy Lift Performs Offshore Windfarm Work

MV Lone proves as project platform for Wikinger wind farm   SAL Heavy Lift informs it has completed the second phase of the Wikinger Pile Testing Campaign with DP II Class vessel MV Lone.

JIT Transit Slots Reduced at Panama Canal

The Panama Canal has experienced an unusual increase in the number of vessels awaiting transit during the past few weeks. Several measures have been implemented to reduce the backlog,

Swiber Gains $405.6 mi Contracts

Business momentum is fast picking up at Swiber Holdings Limited despite the downturn in the oil and gas industry as the Group clinches a total of US$405.6 million for a series of contracts,

Cruise Ship Trends

Carnival to Add Nine Ships to Cruise Fleet

Carnival Corporation enters into strategic partnerships to add nine cruise ships to its fleet over a four-year period starting in 2019; shipbuilders Fincantieri

US Cruise Industry Preparing for Cuba

U.S. cruise lines are preparing to enter uncharted waters -- Cuban waters.   Although U.S. tourists are still technically banned from visiting the Caribbean country,

Cruise Industry Seeks Fortune in China

Builders, Operators Teaming to Fill Voids In Rapidly Growing Chinese Market After an uneven couple of years punctuated by struggling economic factors worldwide,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1176 sec (9 req/sec)