Offshore Gas Terminal Developers Must Decide Level of Interruptibility

Monday, January 12, 2004
Developers of offshore LNG and CNG terminals must decide how much investment to ensure continuous service. The options range from no storage with supply interruptions whenever a ship disconnects from the offloading system, to no storage with two offloading systems designed to accommodate at least one vessel at all times, to offshore liquid storage and possibly underground gas storage with pipeline support to ensure gas is always flowing regardless of weather or operational conditions. To investigate the interruptible versus non-interruptible gas-supply dilemma, Zeus Development has organized a workshop January 29 with presentations from Kathleen Eisbrenner, president, Excelerate Energy; William Perkins, president, Crystal Energy; Craig Taylor, president, HNG Storage; Richard Whitworth, manager supply development, El Paso Corporation among others. Questions to be addressed include: What are the implications of selling gas from offshore LNG/CNG terminals as interruptible? What is acceptable non- interruptible service? How are contracts commonly written to provide recourse to buyers of non-interruptible service? The workshop date is January 29, 2004 and will take place at Zeus Development's offices at 2424 Wilcrest Drive, Houston, Texas. The fee to attend is $297 and you may register online at https://www.zeusdevelopment.com/secure/ini/register.asp .
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Swire Pacific Offshore Acquires 2 Newbuildings

Shipowner and operator, Swire Pacific Offshore Operations (Pte) Ltd (SPO) celebrated the naming of two new vessels, Pacific Centurion, an Anchor Handling Tug Supply (AHTS) vessel,

Changes in Aker Solutions' Top Deck

Tore Sjursen will assume the position as executive vice president for operational improvement and risk management at Aker Solutions on April 1. Knut Sandvik

GAIL Seeks 7 LNG Cargoes

GAIL (India) will buy seven liquefied natural gas (LNG) cargoes for delivery from October 2015 until December 2016, according to the tender document obtained by Reuters.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4033 sec (2 req/sec)