Offshore Project To Get Green Light

Wednesday, June 06, 2001
The BP-led Azerbaijan International Operating Company (AIOC) expects the Azeri government to give a green light in August for the next phase of its Caspian oil production project. AIOC's president David Woodward said the next phase aims to boost production to 350,000 bpd in 2005 from current levels of 100,000-130,000 bpd. The project envisages bringing the Azeri field onstream in early 2005, adding to volumes from the Chirag field which has been in production since 1997. The cost of the expansion plans, called Phase One, is put at $3.3-3.4 billion, Woodward said. The next phase envisages the construction of a drilling platform for 48 wells, a gas compressing facility, an underwater pipeline from the Azeri field and modernization of an onshore oil terminal. The new production levels would be reached just as a planned $2.8-2.9 billion pipeline from Baku across Georgia to Turkey's Mediterranean port of Ceyhan would be completed. AIOC has already pumped more than 14 million tons of oil from Chirag since 1997, exporting oil through a pipeline to Supsa on Georgia's Black Sea coast. AIOC unites BP, Unocal, Azeri state oil company SOCAR, Russia's LUKOIL, Statoil, Exxon Mobil, TPAO of Turkey, Devon Energy, Itochu and Delta Hess. - (Reuters)
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Offshore Installation at Lerwick

A large steel oil storage tank to be installed west of Shetland as part of Premier’s development of the Solan field has arrived in Lerwick onboard a heavy-transport vessel Xiang Yun Kou,

Wagenbourg New Crane for Oil, Gas, Energy Sector

Wagenborg Nedlift has expanded her crane fleet with a brand new 700 tonnes mobile crane. With this crane the fleet is significantly strengthened. Equipped with

Study: An Arctic Oil Well Blowout Could Spread More Than 1,000km

Oil from a spill or oil well blowout in the Arctic waters of Canada's Beaufort Sea could easily become trapped in sea ice and potentially spread more than 1,000 kilometres to the west coast of Alaska,

Finance

Leighton HY14 net margin Up to 2.7%

Leighton Holdings announced its results for the six months to 30 June 2014.   * Total revenue of $11.9 billion, up on HY13 * EBITDAiii of $843 million. Comparable EBITDAiv of $945 million,

LNG to Acquire Bear Head LNG Project in Canada for US$11 mi

Liquefied Natural Gas Limited today announced that it has significantly expanded its presence in the North American Liquefied NaturalGas (LNG) sector by signing

Three Share in Navy US$96.8-M Twin-Ship Modernization Contract

The U.S. Department of Defense informs that AMSEC LLC; CDI Marine Co. LLC; and Q.E.D. Systems Inc., (all located in Virginia Beach, Virginia) are each being awarded a cost-plus-fixed-fee/cost-only,

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1049 sec (10 req/sec)