Offshore Rig Assessment Begins

Thursday, September 01, 2005
As the extent of the damage to offshore oil facilities in the Gulf of Mexico slowly slowly started to emerge after Hurricane Katrina's passage, oil prices rose above $70 a barrel, according to a report in the New York Times.

The hurricane, one of the most severe storms ever to hit the United States, crippled the nation's foremost oil-producing region at the worst possible time for American and global energy markets. It will probably take days or even weeks before the full extent of the damage is fully revealed. Repairs are likely to drag on for months.

Most of the oil and gas production from the Gulf of Mexico remained shut off Tuesday. The region accounts for nearly a third of domestic oil production and a fifth of its natural gas output.

The Coast Guard said that its crews flying over the gulf had spotted several sunken platforms and rigs. The destruction was often accompanied by oil spills.

Offshore platforms were damaged by Katrina's winds and waves, and some had snapped out of their moorings and were drifting away; 10 refineries, accounting for 10 percent of the nation's capacity, were shut down and remained without power Tuesday; strategic pipelines linking the gulf to key markets in the rest of the country were still closed because they too lacked power.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

New Zealand: Maritime Trade is Key

Globally, shipping is on the rise – already 80-90 percent of the world’s trade is by ship; that is more than 12 billion metric tons of goods annually, shipped by 1.

The American Club Reports Solid Progress in 2015

The American Club reported solid progress during 2015 at the annual meeting of its members held in New York yesterday. Despite a challenging economic climate, the

Offshore

US Oil Drillers Cut Rigs after 3 Weeks of Additions

U.S. oil drillers cut rigs this week for a 20th week this year after three weeks of additions, according to a closely followed report on Friday, as crude prices

Subsea 7 Announces PLSV Swap off Brazil

Subsea 7 S.A. said it has reached an agreement with Petrobras to substitute a pipelay support vessel (PLSV) working off Brazil.   The agreement will see the Subsea-7-owned

FPSOs Sit Unprecedentedly Idle

While the oil and gas markets are starting to come to life, nearing the $50 per barrel mark, the future fate of floating production remains a mystery   The 20

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0924 sec (11 req/sec)