OMI Announces Construction of Additional Vessel and Time Charters

Monday, October 13, 2003
OMI Corporation of Stamford, Ct. has exercised an option to have a sixth 37,000 dwt ice class 1A product carrier constructed for it by Hyundai Mipo Dockyard Co., Ltd in Ulsan, Korea; (2) it has entered into time charters for the fifth and sixth of the 37,000 dwt product carriers with the Handytankers KS pool operated by an affiliate of A.P. Moller of Copenhagen for five years from the deliveries in 2005; both of the charters have a base rate and profit sharing on earnings above the base rate. Five of the six vessels now on order have five year time charters with a base rate and profit sharing; (3) the time charters on the vessels RHONE and SEINE with a subsidiary of Total, the French oil major, have been extended for an additional year to April and July 2005, respectively, at a fixed rate for the additional year. Craig H. Stevenson, Jr., Chairman and Chief Executive Officer stated, "The Maersk handysize pool is a top echelon commercial operator of product carriers and we are excited with our direct relationship with them. This gives us two superior charterers with whom we have profit sharing time charters. The additional charters and the extensions of existing charters have increased both our secure revenue base with revenues now into 2010 and our upside from numerous time charters with profit sharing."
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Seaspan Takes Delivery of 5th 10000 TEU Containership

Seaspan Corporation announced yesterday that it accepted delivery of a 10000 TEU containership, the MOL Brightness. The new containership, which was constructed

MHI to Change Name of Group Company

Effective November 1 Mitsubishi Heavy Industries, Ltd. (MHI) will change the name of its group company in Singapore from Mitsubishi Heavy Industries Engineering & Services Private Ltd.

Petrobras P-66 Platform Module to Boost Production

The P-66 platform’s first modules, built at the Tomé Ferrostaal Consortium’s Module Plant located at the Port of Maceió, Alagoas, are now ready and loaded on the São Tomé barge.

Tanker Trends

Easing US Oil Export Ban Unlikey to Raise Gasoline Prices

A government study on Thursday essentially supported the notion that easing the decades-old restriction on exporting U.S. crude was more likely to lower than raise

Exmar Optimistic About Gas Carrier Market into 2015

Belgian gas shipping group Exmar said on Thursday that the market for its very large and midsize gas carriers was at historically high levels in the third quarter

Iran Gas Exports to Europe Would Take at Least 5 Years

Iran would take at least five years to start exporting natural gas to the European Union if sanctions were removed, industry experts said on Wednesday. Last month,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1095 sec (9 req/sec)