OPEC’s 20-Day Wait

Monday, June 19, 2000
As the price per barrel for oil continues to rise and pressure increases on OPEC to release additional supplies, it appears that there is continuing confusion regarding what exactly triggers a movement by OPEC to open the spigots further. Today, an unnamed OPEC official reported that OPEC supply rise would be triggered when the daily OPEC basket price of its crudes stood above $28 for 20 consecutive days, and was not based on a 20-day average price as previously thought. Monday, June 19, was the ninth day consecutive of prices above $28 a barrel. It had originally been understood that production would be increased when the $28 level was the 20-day average.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

NYK Line Joins PNW West Coast Metro Pool

Effective October 20, 2014, NYK Line has become a member of the PNW West Coast Metro Pool (WCMP) operated by Trac Intermodal. The WCMP operates chassis at all major marine terminals,

ISS Manages Heavy-lift Project at Port of Mombasa

Inchcape Shipping Services (ISS) announced it has completed another complex heavy-lift project in Africa, this time at the Port of Mombasa in Kenya. ISS was

Offshore

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

Total CEO Killed in Moscow Runway Accident

Private jet collided with snow plow during takeoff; Total's CEO a defender of Moscow policies. Insiders Boisseau and Pouyanne long seen as potential successors.

Statoil: New Oil in the Grane Area

Statoil has together with PL169 partners proved new oil resources in the D-structure in the vicinity of the Grane field in the North Sea.   Well 25/8-18 S, drilled by the rig Transocean Leader,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1032 sec (10 req/sec)