Oriskany to be Largest Ship Reefed

Tuesday, May 02, 2006
The decommissioned aircraft carrier ex-Oriskany (CV/CVA 34) will become the largest ship intentionally sunk as an artificial reef in mid-May. The 888-foot ship will be reefed in the Gulf of Mexico approximately 24 miles off the coast of Pensacola, Fla., and will benefit marine life, sport fishing and recreational diving in the area. In November 2004, President George Bush signed the 2004 National Defense Authorization Act, allowing the Navy to transfer inactive vessels to states, U.S. possessions, municipal corporations and municipalities for artificial reefing purposes. "The sinking of the ex-Oriskany will provide an additional offshore location for the regional recreational fishery and diving industries, which will translate into positive economic benefits for Pensacola and the State of Florida,” said Capt. Larry Jones, the Navy's Inactive Ships program manager. Built in 1945, Oriskany received precedent-setting approval from the Environmental Protection Agency (EPA) after a series of studies indicated that the ship will create an environmentally safe artificial reef. EPA Region IV issued a risk-based Polychlorinated Biphenyl (PCB) disposal approval in February based on their findings that the disposal action would not pose an unreasonable risk of injury to health or the environment. “The Navy’s seawater leaching studies and fate and transport models show that the ex-Oriskany reef will be safe for both people and marine life,” said Jones.

“The Navy takes environmental stewardship seriously and the ex-Oriskany sinking will be a historic event for the Navy and the state of Florida to create a habitat for marine life, sport fishing and recreational diving off the coast of the Florida Panhandle,” said Jones. The notional sink date for ex-Oriskany is May 17, subject to weather conditions. The Navy estimates it will take approximately five hours for the ship to sink, ideally with the ship landing upright on the ocean floor at a depth of approximately 212 feet. This will provide a 61-foot navigational clearance above the ship at mean low water. After the vessel reaches the bottom, ownership of the vessel transfers to the state of Florida.

The Inactive Ships Program Office, part of the Navy’s Program Executive Office for Ships, is responsible for transitioning ships from the fleet for storage and disposal, preserving the naval heritage through donations, enhancing marine ecosystems through artificial reefing, and protecting the environment through ship dismantling and recycling.

From Naval Sea Systems Command Office of Corporate Communications

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

MOL Signs Long-Term Charter with Uruguayan JV for FSRU

Japanese shipping company Mitsui O.S.K. Lines, has, through its wholly-owned subsidiary Lakler S.A., agreed to conclude a charter contract with Gas Sayago, for

Team Britannia, GAC Inks Partnership Deal

As Team Britannia prepares for its bid to break the round-the-world powerboat record later this year, GAC has been named their official shipping and logistics partner.

Libya's PFG to Lift Terminal Blockades

Petroleum Facilities Guard has blocked terminals for months. Ras Lanuf, Es Sider terminals damaged by fighting. Libya's Petroleum Facilities Guard (PFG) will

Navy

NASSCO Bags USS Oak Hill Modification Award

General Dynamics NASSCO-Norfolk was awarded a $42 million cost-plus-award-fee modification to a previously awarded contract for the repair and alteration for the USS Oak Hill (LSD-51).

Panama Canal Launches Green Award System

The Panama Canal has launched the Green Connection Award, a new initiative to recognize customers who demonstrate excellent environmental stewardship, and to encourage

US Navy Tests Latest Aegis Weapon System

The U.S. Navy conducted a series of cooperative air defense test exercises with the Spanish navy that culminated in live missile firing events using the latest Aegis Weapon System baseline July 20-21.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0765 sec (13 req/sec)