Panama Canal Awards First Construction Contract

Thursday, July 19, 2007
The Panama Canal Authority (ACP) took one step closer to breaking ground for the expansion of the Panama Canal Tuesday, when it officially awarded the first expansion construction project contract to Constructora Urbana S.A. (CUSA).

The selection process began May 7, when the ACP released its request for proposals to begin the first of five dry excavation projects to create the new Pacific Locks access channel. This new channel will link a new, third set of locks on the Pacific end of the Canal with the existing Gaillard Cut (the narrowest stretch in the Panama Canal). This project represents approximately 16 percent of the total excavation for the new Pacific Locks access channel.

At a special ceremony on July 6, the ACP reviewed the bid submissions for the first dry excavation of the new Pacific Locks access channel. The chart below shows the companies that submitted bids and their corresponding bid price. The ACP selected the lowest priced proposal that met all of the project’s requirements.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Iran: Maersk Boxhip Dispute Near Settlement

Iran said on Wednesday a legal settlement could be reached soon over its seizure of the Marshall-Islands flagged Maersk Tigris container ship in the Strait of Hormuz last month,

Roozendaal to head MacGregor Business Area

Michel van Roozendaal (M.Sc. Aerospace Engineering; MBA INSEAD, Fontainebleau; b. 1963) has been appointed President of the MacGregor business area. He will

ENSCO 110, ENSCO 104 Contracted for UAE & M.E.

Ensco plc has entered into a three-year contract with NDC for a new premium jackup, ENSCO 110. This newbuild rig is scheduled to commence operations later this

Environmental

US Marine Highways to Help Prepare for the Future

With America's population expected to grow by 70 million over the next 30 years, moving the goods that enrich our lives --and the freight that fuels our economy-- will be a key challenge.

Gulf of Finland Collision Related Spill Risk to Quadruple in the Future

A single oil spill can release 30,000 tonnes of oil into the ocean if two vessels collide. In grounding the high weight can lead to oil disaster, in the Baltic Sea up to 120,000 tonnes.

New Ships Meet 2020 Design Standard

A new CE Delft study has revealed that many recently constructed ships already meet the International Maritime Organization’s (IMO) design efficiency standard for 2020, says Pan European Networks.

 
 
Maritime Careers / Shipboard Positions Maritime Security Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1218 sec (8 req/sec)