Panama Canal Awards First Construction Contract

Thursday, July 19, 2007
The Panama Canal Authority (ACP) took one step closer to breaking ground for the expansion of the Panama Canal Tuesday, when it officially awarded the first expansion construction project contract to Constructora Urbana S.A. (CUSA).

The selection process began May 7, when the ACP released its request for proposals to begin the first of five dry excavation projects to create the new Pacific Locks access channel. This new channel will link a new, third set of locks on the Pacific end of the Canal with the existing Gaillard Cut (the narrowest stretch in the Panama Canal). This project represents approximately 16 percent of the total excavation for the new Pacific Locks access channel.

At a special ceremony on July 6, the ACP reviewed the bid submissions for the first dry excavation of the new Pacific Locks access channel. The chart below shows the companies that submitted bids and their corresponding bid price. The ACP selected the lowest priced proposal that met all of the project’s requirements.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

OSV Power

The continued maturation of Offshore Service Vessel design is embodied in recent contracts and deliveries.  Ulstein Verft subsea newbuild Island Performer was

Kongsberg to Supply FPSO Safety System

Kongsberg Maritime Engineering (KME), the wholly owned Engineering, Procurement and Construction (EPC) subsidiary of global maritime technology developer Kongsberg Maritime,

CWind Wins 3-year O&M Services Contract

CWind, a provider of services to the offshore wind industry, have signed a three-year contract to provide crew and equipment transfer for DONG Energy and Scottish

Environmental

Long Beach Cargo Operations Resume

Repair work begins after storm surges subsides The Port of Long Beach resumed full cargo-handling operations Thursday, Aug. 28, after a lessening of storm surges

Restoring the NY-NJ Harbor Estuary

Significant challenges often require a team effort. Restoring the New York-New Jersey Harbor Estuary is one of them. A group of professionals from the Army Corps of Engineers,

GPS Discharge Control System for Food Waste

Through a cooperation with Marine Position AB, Uson Marine AB can now offer functionality from the Seatrade award winning system Environmental Navigator for its

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1123 sec (9 req/sec)