Panama Canal: First Tender for $5b Expansion

Monday, May 14, 2007
On Monday, May 7, the Panama Canal Authority (ACP) got one step closer to beginning its historic expansion with the release of the first construction project tender (request for proposal submission) for dry excavation along the north access channel on the Pacific end of the Canal.

The Expansion Program adds a new lane of traffic along the Panama Canal through the construction of a new set of locks, which will double the tonnage capacity and allow the transit of substantially larger vessels. The North Pacific channel excavation, which will be located west of Pedro Miguel and locks, is the first of five dry excavation projects that will help link the new Post- Panamax Locks on the Pacific end of the Canal to the existing Gaillard Cut and represents approximately 16 percent of the total excavation for the new Pacific Locks Access Channel.

The scope of work under the contract will include: the removal of non-classified material and disposal of excavated material at indicated locations, and the construction of new gravel roads and ditches.

“We are making history with the release of the first construction project tender. The Expansion is moving forward with great progress,” said ACP Engineering and Programs Management Director Jorge L. Quijano. “We hope to attract firms with significant experience in this type of work as we begin this important phase of the project.”

Information about this tender (No. 67252) is now available through the ACP’s online bidding system (SLI), http://www.pancanal.com/esp/procsales/buy.html or via the ACP’s Web site at www.pancanal.com. Interested parties have 55 days from the tender release date for bid submissions. The ACP expects to award the contract in July or August 2007.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

First Subsea Achieves API 17L1 Certification for Bend Stiffener Connectors

Connector technology developer First Subsea has received APL 17LI certification for its bend stiffener connectors from the American Petroleum Institute, the company announced today.

Gulf of Mexico Sees First LNG-powered OSV

A special Offshore Supply Vessel (OSV) has been delivered to Shell for its deepwater operations in the Gulf of Mexico.   The vessel, Harvey Energy, is chartered

Bestobell Bags Hat Trick Order in China

Bestobell Marine, part of the President Engineering Group, has received its third order in the past 12 months from Hudong Zhonghua shipyard in China. The deal

Contracts

Maersk Oil Hires Ampelmann Gangway System

After having performed a walk to work (W2W) campaign in the summer of 2014, Motion Compensation Gangways (MCG) developer Ampelmann has again been awarded a contract

Lamprell Delivers Jackup Rig to Greatship

Lamprell announced it has completed construction on jackup drilling rig Greatdrill Chaaru, delivering the rig to Greatship Global Energy Services Pte. Ltd.    Greatdrill

Food Handling Products Ordered for Ovation of the Seas

ALMACO informs it has been contracted to deliver food handling products for the Royal Caribbean International’s Ovation of the Seas, the third Quantum-class ship

 
 
Maritime Contracts Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1441 sec (7 req/sec)