Panama Canal: First Tender for $5b Expansion

Monday, May 14, 2007
On Monday, May 7, the Panama Canal Authority (ACP) got one step closer to beginning its historic expansion with the release of the first construction project tender (request for proposal submission) for dry excavation along the north access channel on the Pacific end of the Canal.

The Expansion Program adds a new lane of traffic along the Panama Canal through the construction of a new set of locks, which will double the tonnage capacity and allow the transit of substantially larger vessels. The North Pacific channel excavation, which will be located west of Pedro Miguel and locks, is the first of five dry excavation projects that will help link the new Post- Panamax Locks on the Pacific end of the Canal to the existing Gaillard Cut and represents approximately 16 percent of the total excavation for the new Pacific Locks Access Channel.

The scope of work under the contract will include: the removal of non-classified material and disposal of excavated material at indicated locations, and the construction of new gravel roads and ditches.

“We are making history with the release of the first construction project tender. The Expansion is moving forward with great progress,” said ACP Engineering and Programs Management Director Jorge L. Quijano. “We hope to attract firms with significant experience in this type of work as we begin this important phase of the project.”

Information about this tender (No. 67252) is now available through the ACP’s online bidding system (SLI), http://www.pancanal.com/esp/procsales/buy.html or via the ACP’s Web site at www.pancanal.com. Interested parties have 55 days from the tender release date for bid submissions. The ACP expects to award the contract in July or August 2007.

Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Del Mar Signs Agency Agreement with Ciramar

Del Mar Marine Corp. announced it has signed an agency agreement with Ciramar Shipyards allowing the company to promote Ciramar Shipyard´s docking and facilities

Bouchard Orders Two Newbuild ATB Tugs

Morton S. Bouchard III, President and CEO of Bouchard Transportation Co., Inc., today announced the next step in Bouchard Transportation Co., Inc.’s ongoing fleet

Great Lakes Shipyard Wins EPA Drydock Contract

Great Lakes Shipyard has been awarded a contract for the United States Environmental Protection Agency (EPA) vessel R/V Lake Explorer II. The scope of work will include drydocking,

Contracts

VT Halter to Build Bouchard ATB Tugs

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), today announced new contracts to build two 130-foot Articulated Tug Barge

Del Mar Signs Agency Agreement with Ciramar

Del Mar Marine Corp. announced it has signed an agency agreement with Ciramar Shipyards allowing the company to promote Ciramar Shipyard´s docking and facilities

Great Lakes Shipyard Wins EPA Drydock Contract

Great Lakes Shipyard has been awarded a contract for the United States Environmental Protection Agency (EPA) vessel R/V Lake Explorer II. The scope of work will include drydocking,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Port Authority Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1402 sec (7 req/sec)