Panama Canal Increase in Mumber of Booking Slots

Wednesday, January 02, 2008
The Panama Canal Authority issued an advisory stating that, effective January 1, 2008, it will offer one additional booking slot during the third period to regular (non-restricted) vessels. During this period, a maximum of nine slots will be available for regular vessels. Of these, no more than five may be allocated to vessels transiting in the same direction. Advisory No. 32-2007 (HK Law)
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

New Monitoring Network for Scottish Ports

Historically, ferry masters operating off the west coast of Scotland would have to sail to a port and on arrival visually assess the weather and tide conditions

BMT Awarded Port Geographe Coastal Engineering Contract

BMT JFA Consultants (BMT), a subsidiary of BMT Group,  has been awarded a contract by the Western Australian Department of Transport (DoT) to provide services as

California Okays Ship Emissions Capturing System

Clean Air Engineering-Maritime (CAEM)'s emissions treatment system for ocean-going vessels has been approved by the California Air Resources Board, giving operators

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0834 sec (12 req/sec)