Panama Canal Lock Outage

Monday, October 04, 2004
The Panama Canal Authority issued an Advisory stating that the East Lane of Gatun Locks will be out of service on October 6-15 in order to perform rehabilitation work on the tow track and certain other work. Transit Reservation System Condition 2 will come into effect on October 6. Advisory 47-2004 (HK Law)
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Union Vows More Channel Tunnel Disruption

Ferry workers will disrupt traffic through the sub-sea Channel tunnel between France and Britain for 48 hours from midday on Thursday, a union official said. "We

Statoil to Suspend Saipem Rig Contract

Norwegian oil major Statoil said on Wednesday it will suspend a rig contract with Italy's Saipem due to overcapacity in its rig portfolio. The suspension of

Oranjewerf Ship Repair becomes Damen Shiprepair Oranjewerf

On 1 July 2015, Oranjewerf Ship Repair, which joined Damen Shipyards Group in 1989, will officially change its name to Damen Shiprepair Oranjewerf. This name

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1190 sec (8 req/sec)