Panama Canal – Maintenance Advisory

Tuesday, November 18, 2008

The Panama Canal Authority issued an advisory stating that the centerwall culvert of Miraflores Locks will be out of service from November 18 through November 28 for repairs of seven rising stem valves.  This will slow lockages.  The west lane of Gatun Locks will be out of service from November 23 through November 24 for repairs to the vehicular bridge.  Transit Reservation System Condition 1.a will be in effect from November 18 through November 28.  Advisory 30-2008 (11/13/08).

(Source: Holland & Knight)

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navigation

NavStation to Launch at SMM

Touch screen technology has transformed everyday life and now, thanks to Norwegian e-navigation specialist NAVTOR, it is set to revolutionize operations onboard busy vessel bridges.

VIKING Saatsea Puts Crew Training in its Place

VIKING Saatsea will be at SMM 2014 to showcase the revolution it has brought about in crew training – moving everything on board to cut costs, speed up certification,

BCG Releases PCVM Emulation

Buffalo Computer Graphics (BCG) Inc. announced the addition of another emulation product to its family of Radar Simulators. BCG has completed an emulation of the VisionMaster FT radar – our PCVM.

 
 
Maritime Contracts Maritime Standards Offshore Oil Pipelines Pod Propulsion Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0778 sec (13 req/sec)