Panama Canal Turns 93

Wednesday, August 15, 2007
Ninety-three years after its grand opening in 1914, the Panama Canal will mark its anniversary tomorrow by celebrating the successful start of its historic Expansion Program. Nearly a year after Panamanians approved a national referendum to expand the waterway, the Panama Canal Authority (ACP) has set the project in motion. It awarded the first expansion-related construction contract, the first of five dry excavation projects that will create the new Pacific Locks access channel. This new channel will link a new, third set of locks on the Pacific end of the Canal with the existing Gaillard Cut (the narrowest stretch in the Panama Canal).

Recently, the ACP assembled an experienced internal team to manage this historic undertaking, hired legal and financial advisors, and released other preliminary tenders. It has also presented the Canal's Expansion Program to international financial institutions, as it begins to weigh financing alternatives for the project. Expansion will build a new lane of traffic along the Panama Canal through the construction of a new set of locks, doubling capacity and allowing more traffic and longer, wider ships. This project, which just received the 2008 Samoter award for "Best Construction Project in the World," will be the largest undertaking at the Canal since its opening. There were 14,194 total transits in fiscal year 2006. Since August 15, 1914, more than 922,000 vessels have transited the waterway.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

DNV GL’s Synergi to Manage Siem Offshore Newbuilding Projects

Siem Offshore has chosen DNV GL’s Synergi Project to manage nine newbuilding projects. Synergi Project software The software is used to optimize the collaboration

Bahri Inks Contracts with Hyundai to Build 5 VLCCs

The National Shipping Co. of Saudi Arabia (Bahri) signed contracts on Thursday with Hyundai Samho Heavy Industries (HSHI) to build five very large crude carriers (VLCCs),

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

 
 
Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1880 sec (5 req/sec)