Panamanian Dredging Kickoff

Thursday, November 20, 2008

Manning the controls of a large cutter suction dredge, Panamanian President Martín Torrijos kicked off the Pacific sea entrance dredging work for the waterway’s expansion on Nov. 17.

He was accompanied by First Vice-President and Minister of Foreign Affairs Samuel Lewis Navarro, Panama Canal Authority (ACP) Board Chair and Minister of Canal Affairs Dani Kuzniecky and ACP Administrator/CEO Alberto Alemán Zubieta.

In April 2008, the ACP awarded Belgium-based Dredging International the $177.5 million contract to dredge the Pacific sea entrance, an essential component of the Canal’s Expansion Program that will provide enough draft and width for longer, wider ships to enter the new locks.

President Torrijos was on hand to initiate the work of Dredging International’s cutter suction dredge The Vlaanderen XIX. It will be used to remove approximately 1.5 million cubic meters of soft material on the northern most areas of the Pacific sea entrance. A stationary dredger which makes use of a cutter head to loosen the material to be dredged, The Vlaanderen XIX pumps the dredged material via a pipeline ashore to a designated site.

When the Pacific sea entrance dredging contract concludes, the dredging project will have widened the navigation channel to a minimum of 738 feet (225 m) and deepened it to a minimum of 51 feet (15.5 m) below Mean Low Water Springs (MLWS).  


The ACP is the autonomous agency of the Government of Panama in charge of managing, operating and maintaining the Panama Canal. The ACP is governed by its organic law and the regulations approved by its Board of Directors.

(www.pancanal.com)

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

HMS Prince of Wales Delivery Begins

A huge section of hull for HMS Prince of Wales, the second aircraft carrier being delivered to the Royal Navy, has today departed BAE Systems in Glasgow on a 600-mile

Gondan to Build Spanish Patrol Boats

Gondan Shipyard has recently signed a contract with the Guardia Civil, Spain’s Civil Guard, for the building of two patrol boats. The aluminum and fiber (PRFV ) vessels will measure 20.

Marseilles Fos Reports Mixed First Half

First-half container traffic at leading French port Marseilles Fos totalled 583,287 teu – up 7% on the first six months last year - marked by a 10% increase at the deepsea Fos terminals.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1219 sec (8 req/sec)