Perdido, Energy Construction Project of the Year

Sunday, December 20, 2009
File Perdido project leaders who attended the Platts Global Energy Awards, pictured left to right: Kurt Shallenberger (Topsides Leader), Chris Smith (Operations Manager), Dale Snyder (Project Manager), Bill Townsley (Venture Manager). (PRNewsFoto/Shell Oil Company)
Perdido project leaders who attended the Platts Global Energy Awards, pictured left to right: Kurt Shallenberger (Topsides Leader), Chris Smith (Operations Manager), Dale Snyder (Project Manager), Bill Townsley (Venture Manager). (PRNewsFoto/Shell Oil Company)

Shell’s Perdido Development, the world's deepest offshore oil platform, won the ENR Energy Construction Project of the Year award at the Platts Global Energy Awards Ceremony on December 3, 2009. In addition, Shell was a finalist in three other categories. Members of the Shell project management team as well as chief scientists were at the ceremony to accept the award.

Shell designed the Perdido host spar, a floating production facility, which is jointly owned by Shell (35%, operator), Chevron (37.5%), and BP (27.5%). The regional development is located in about 8,000 feet of water in an isolated sector of the Gulf of Mexico and will act as a hub for and enable development of three fields: Great White, Tobago and Silvertip. The project has already set a world water depth record in drilling and completing a subsea well 9,356 feet (1.77 miles) below the water's surface with plans to drill an even deeper well at 9,627 feet. First production is expected in early 2010.

An impartial panel of international energy experts, including energy ministers, national regulators, past and present heads of major energy companies, and leading academics and legislators selected Perdido as the winner of ENR Energy Construction Project of the Year.

"When we bought the Perdido leases in 1996, we had just installed the Mars platform in 3,000 feet of water. The technology did not yet exist for 8,000 feet, yet we went out knowing that we could develop it when we got there. What I'm most proud of, though, is that we have had no lost time injuries over the life of the project," said Project Manager Dale Snyder.

(www.shell.com)

Email AddThis Feed Button Share
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Liebherr Delivers Heavy Lift Offshore Crane For “Vidar”

In June, components weighing up to 420 tonnes each for Liebherr’s new heavy lift offshore crane CAL 45000-1200 Litronic  were loaded from Liebherr MCCtec Rostock

BMT Acquires Verweij & Hoebee

To strengthen BMT’s market position in blue water surveys, BMT Group Ltd, acquired marine survey and consulting engineers, Verweij & Hoebee.     A co-founder

Crowley's 'Alert' Tugboat Commended for Alaska Rescue Tow

Representative Eric Feige from the Alaska State Legislature presents a letter of commendation to the 'Alert's crew for their rescue tow of drill barge 'Kulluk'.

Offshore

Offshore Wind Spend to Average $21B per year

Douglas-Westwood (DW) forecast offshore wind installations averaging 3.2 GW per year over the next ten years with capital expenditure hitting a peak of $24.1B in 2016.

Liebherr Delivers Heavy Lift Offshore Crane For “Vidar”

In June, components weighing up to 420 tonnes each for Liebherr’s new heavy lift offshore crane CAL 45000-1200 Litronic  were loaded from Liebherr MCCtec Rostock

TGS Starts Barents Sea 3D Seismic Survey

The 3D EM data is being acquired by the M/V 'Atlantic Guardian': data will be available to clients through both EMGS and TGS. The survey is supported by industry funding.

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright