Petrobras Contracts for Reservoir Monitoring

Thursday, August 11, 2005
Halliburton’s Energy Services Group was awarded a contract to provide its EZ-Gauge monitoring system technology on projects for Petrobras in Brazil. “Petrobras selected the EZ-Gauge system technology because it provides a cost-effective, accurate pressure data collection system that is free of downhole electronics,” said Cidar Mansilla, operations manager, Latin America South, Halliburton. “The reliability and longevity of the system is significantly greater most other monitoring technologies.” The EZ-Gauge system is designed to reduce cost, improve reliability and improve longevity over conventional electronic systems, particularly in downhole environments exceeding 300 degrees Fahrenheit.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Japan Military Wants China "Crisis Management" Pact

Japan's highest-ranking military officer on Friday urged an early start to a "crisis management" mechanism with China amid conflicting claims to a group of tiny East China Sea islands.

Wärtsilä Integrated Solutions for Maersk's AHTS Vessels

A new series of six Anchor Handling Tug Supply vessels to be built at the Kleven Verft AS in Norway for the Danish based Maersk Supply Service A/S - part of the A.

Fourth Rig Delivered to Perforadora Central

Keppel AmFELS LLC, a wholly owned US subsidiary of Keppel Offshore & Marine Ltd (Keppel O&M), has delivered the jackup rig, Coatzacoalcos, to Mexico’s Central Panuco S.

Workboats

Seacor Takes Delivery of 10,800 HP Crewboat

Seacor Marine is building ever larger and more powerful mono-hull crew/supply boats. The first of these to be delivered is the 202x34-foot Alex F. McCall with some very impressive statistics.

A Classic Repower

The tug Falcon was built by Modern Marine Inc. in 1978. In the intervening years, companies that employed her have changed hands a number of times until 2013 when Vane Line Bunkering of Baltimore,

The Legal Consequences of 46 CFR Subchapter “M”

As the holiday season and the end of another year quickly approaches, the towing industry patiently waits for the Coast Guard to finalize the long-awaited towing vessel inspection rule.

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2996 sec (3 req/sec)