Petrobras Selects Platform Design

Tuesday, December 18, 2007
Petrobras have selected an Aker Kvaerner design for the hull of its new semisubmersible production platform to be located offshore Brazil, at the Marlim Sul deep water field development.

The design is a copy of the P-51 semisubmersible platform, developed by Aker Kvaerner for Petrobras in 2002. P-56 will be the third semisubmersible platform for Petrobras of this design. The new contract covers the additional licence as well as an option for utilizing technical assistance from Aker Kvaerner during the project.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Hornbeck Completes $114M Sale of OSVs to U.S. Navy

Hornbeck Offshore Services has closed the sale of three 250EDF class OSVs to the U.S. Navy, the company announced today.   The three vessels were sold for cash consideration of $114 million,

LTE Deployment Launched in the Gulf of Mexico

Industrial LTE wireless broadband services provider Infrastructure Networks, Inc. (INET) is deploying a pilot LTE system in the Gulf of Mexico.   INET said its

Cheap Oil Threatens Debt Squeeze for Smaller North Sea Producers

Small and mid-sized independent oil producers in the British North Sea could face a financing squeeze this year as banks cut lending linked to the value of oil reserves,

Container Ships

MOL Expands Container Fleet

Mitsui O.S.K. Lines, Ltd. has signed a deal for construction of four 20,000 TEU containerships with Samsung Heavy Industries. MOL also concluded an MOU for long-term chartering of two 20,

Mitsubishi Bags Fourth LPG Carrier Order from Astomos

Tokyo-based Astomos Energy Corp has placed an order today with Mitsubishi Heavy Industries (MHI) for a very large liquefied petroleum gas (LPG) carrier.     The 83,

Container Ship Runs Aground at Fremantle Port

A ship that ran aground at Fremantle Port early Saturday has been refloated. The 62,000-tonne Denmark-registered container ship Maersk Garonne became stuck in soft sand about 500m off South Mole.

 
 
Maritime Contracts Naval Architecture Navigation Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4105 sec (2 req/sec)