PetroCom’s VSAT Sat Services Completely Operational

Tuesday, September 27, 2005
PetroCom is making great strides in repairing its communication systems that were damaged by Hurricane Katrina. Patched very small aperture terminal (VSAT) satellite and wireless systems that were quickly operational with ingenuity and resourcefulness are now repaired properly and working near capacity. “My staff has done an unbelievable job of improvising and thinking outside of the box to restore services. Our first goal was to patch communication trunk-lines and make them operational, which allowed us to evaluate the full extent of the damages,” said PetroCom President & COO Ken Wright. “We have restored our satellite backbones to full capacity and are now working closely with platform owners to repair dedicated equipment and speed the recovery of the Gulf’s oil and gas industry.” PetroCom’s DS3 fiber-optic connection has been repaired in New Orleans and VSAT satellite services are fully operational and capable of running at full capacity. PetroCom has deployed portable VSAT systems to replace damaged, dedicated equipment in the Gulf of Mexico. Portable VSAT systems are available for immediate installation. Repairs on the wireless switch that handles GSM and analog wireless communication are complete, and terrestrial communication interconnects have been re-established. Terrestrial connectivity has been greatly restored to land-based switched networks. The cellular network is capable of carrying 75 percent of the volume it handled before Hurricane Katrina and 36 of 43 Gulf cell sites are functioning. PetroCom is working with platform owners to continue service restoration. A list of functional towers can be found at www.petrocom.com/StormTrack/public/. PetroCom’s roaming capabilities with Cingular Wireless have been restored, and its wireless switches are processing analog and GSM cellular traffic from many of their towers in the Gulf. Several small voice/data/fax wireless communication packages are available for short-term use.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navigation

Ohio River Reopens as Oil Spill Clean-up Progresses

A 15-mile section of the Ohio River was reopened for limited traffic on Wednesday as clean-up of a 5,000-gallon fuel oil spill continued, the U.S. Coast Guard said on Wednesday.

VSTEP Delivers FMB Simulator to Danaos

Danaos Corporation purchased a NAUTIS DNV Class A FMB Simulator and Instructor Station for training of its fleet members.  The simulator will be delivered and installed

FARO 3D Documentation Conference

The FARO 3D Documentation Conference, to be held October 13-15, 2014, was created as a forum for sharing knowledge, best practices and insight into the world of laser scanning and 3D documentation.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pod Propulsion Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1115 sec (9 req/sec)