Port Arthur LNG Project Meetings Ccancelled

Tuesday, October 04, 2005
Because of damage in the area due to Hurricane Rita, the Federal Energy Regulatory Commission (FERC) is canceling its planned public comment meetings in Vinton, Louisiana and Port Arthur, Texas for the draft Environmental Impact Statement (EIS) for the Port Arthur LNG Project until further notice. The period for submittal of written comments, though, has been extended to December 16. 70 Fed. Reg. 57592 (HK Law)
Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Becker Marine, Kotug Sign MOU for LNG Hybrid Barge

Press release - Becker Marine Systems and KOTUG signed a Memorandum of Understanding to launch a LNG Hybrid Barge in the Port of Rotterdam with effect from June 2017.

Teekay LNG Partners Declare Distribution

Teekay GP LLC, the general partner of Teekay LNG Partners L.P. has declared a cash distribution of $0.70 per unit for the quarter ended September 30, 2015. The

MARAD to Fund Study on LNG Conversions

MARAD provides funding to further study LNG as marine fuel for containerships The U.S. Maritime Administration (MARAD) announced it has entered a $900,000 cooperative

Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1010 sec (10 req/sec)