Portland-based Yard Completes NOAA Refurb Job

Thursday, October 02, 2003
In just the past year, Cascade General Inc., a Portland, Ore., shipyard, has completed refurbishing one research ship for the National Oceanic and Atmospheric Administration (NOAA) and begun work on a second ship. "Refurbishing these ships is a win-win situation," said retired Navy Vice Admiral Conrad C. Lautenbacher Jr., under secretary of commerce for oceans and atmosphere and NOAA administrator. "NOAA gains two modernized ships to help carry out its survey and science missions, while helping to create jobs and stimulate the economy in Portland." Lautenbacher will visit the shipyard today to see how work is progressing on the NOAA ship Fairweather. Fairweather is a hydrographic survey ship first commissioned in 1968, but has been inactive for more than 12 years. Cascade General began modernizing the ship on Feb. 10 of this year. The $15.5 million contract is expected to be completed in Feb. 2004. Between 80-100 Cascade General employees are working on the renovation. Fairweather will operate from its new homeport in Ketchikan, Alaska, conducting hydrographic surveys for NOAA's nautical charting program. A contract for renovation and conversion of the NOAA ship Nancy Foster, a former Navy yard torpedo test craft, was awarded to Cascade General on Nov. 20, 2001. After being refurbished at a total cost of $7.7 million, the ship departed the shipyard on Dec. 23, 2002. Since becoming operational, Nancy Foster has been conducting coastal oceanographic research along the East Coast.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Litigation Can Cost Shipbrokers an Arm & a Leg

A survey of London solicitors by specialist intermediaries insurer ITIC has highlighted the high cost of litigation for shipbrokers and others seeking judgment in the English courts,

Attestation / Endorsement services for seaman in UAE

The Maritime Administration of the United Arab Emirates has introduced services for the attestation of seaman contract and issuance of oil/chemical/gas tanker endorsement.

Concordia Captain Tried to Blame Wreck on Electrical Blackout

The captain of the Costa Concordia tried to persuade the crisis coordinator of the cruise line to pretend an electrical blackout had caused the shipwreck, a court was told on Monday.

 
 
Maritime Contracts Maritime Security Naval Architecture Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2042 sec (5 req/sec)