Ports Extend Public Comment Period Deadline

Tuesday, July 25, 2006
The Ports of Long Beach and Los Angeles are extending the public comment period for the San Pedro Bay Clean Air Action Plan by 30 days, to August 28, to ensure adequate time is allowed for the public to thoroughly review, evaluate and develop constructive comments to increase the effectiveness of the strategies outlined in the Plan. Because of the deadline extension, the final Plan will not be completed until October. So, the Ports are pushing back adoption of the Plan, rescheduling action by the Long Beach and Los Angeles harbor commissions for late October or November. The extension will not delay the ports from moving forward with programs to improve air quality. The ports are currently developing, and expect to implement the following strategies prior to formal adoption of the Plan: • Expansion and coordination of the ports’ air monitoring network, in support of the San Pedro Bay action plan standard, • Release of a joint Request for Proposals (RFP) for a liquefied natural gas (LNG) heavy-duty vehicle fleet, • Release of a joint RFP for development of LNG fueling infrastructure and heavy-duty vehicle maintenance facility, • Continued implementation and coordination on expansion of the Vessel Speed Reduction program, • Port of Long Beach’s completion of an environmental review of an Alternative Maritime Emission Control System (AMECS), which will test whether a “sock” and shore-side “scrubber” technology can reduce emissions from vessels at berth, • Planning and construction of shore-side electrical infrastructure, • Working with Pacific Harbor Line on the technology evaluation and purchasing of new switcher locomotives, • Technology advancement activities, including evaluation of LNG-fueled yard hostlers, design and development of diesel-electric hybrid yard hostlers, and participation in a vessel emission reduction project to evaluate the effectiveness of slide valves and on-board fuel emulsification, • Release of an RFP to evaluate a green container transportation system, • Inclusion of environmental covenants in new and modified lease negotiations. Additional strategies and programs are under development and will be released soon after adoption of the Plan.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Mercury Diesel Engines for 16 New USCG Boats

Mercury Marine has entered an agreement with Metal Shark Aluminum Boats to power 16 U.S. Coast Guard (USCG) boats with Mercury diesel engines.   “Mercury Marine’s 2.

Masterbulk, SeaSafe Ink Lifeboat Service Deal

Masterbulk Singapore has entered into a five-year global sole service supplier agreement with the Wallem Group’s lifeboat maintenance service company, SeaSafe Marine.

Wärtsilä wins BWMS Order for 3 Vessels

Wärtsilä has received another important order for its Ballast Water Management Systems (BWMS). Three new container ships being built for a major European shipping

Ports

SeaCURE BWTS Earns 2nd US Patent

Evoqua Water Technologies has been awarded a second United States patent on its technical solution for treating ballast water.  This latest patent was granted by

SITC Inks Deal with Qingdao Port

SITC International signed a strategic cooperation agreement with Qingdao Port International Co., Ltd. in Qingdao yesterday in order to further strengthen the strategic

Superyacht Marina Planned at San Juan, Puerto Rico

Puerto Rico Ports Authority issues RFP for Marina District. The project envisions a superyacht marina and dry dock maintenance, repair and overhaul facility

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1406 sec (7 req/sec)