Production on Solar-powered Gas Platform Begins

Wednesday, April 19, 2006
The world's first gas platform powered solely by wind and solar energy has begun production, in a breakthrough for the offshore industry in low-cost exploitation of marginal fields. Royal Dutch Shell announced that it has begun pumping gas from its Cutter platform in the U.K. southern North Sea. The tiny platform, powered by two wind turbines and a pair of solar panels, cost $142.6m to develop and is expected to produce gas at the rate of some 3 million cubic feet a day for the next 15 years. The Cutter platform, about half the size of conventional satellite platforms and built for 40 per cent of the cost, uses only a fraction of the energy of traditional oil installations. It measures just eight meters by eight and has no helideck. Based on the construction of offshore wind turbines, it rests on a single leg. (Source: The Independent)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Subsea 7 Profits Dip in Q1

Subsea 7 S.A. announced its financial results for the first quarter ending March 31, 2016, reporting revenues of $746 million, down 37 percent from the prior year period.

Sembcorp Profit Halved as Clients Defer Projects

Revenue falls 30 pct; order book at S$9.7 billion. Singapore rig-builder Sembcorp Marine's quarterly profit halved as customers deferred projects, and it faces

Nigeria's LNG Export Falls

Babs Omotowa, Managing Director and Chief Executive Officer of Nigeria LNG Limited (NLNG), has raised alarm over Nigeria’s dwindling investments in Liquefied Natural Gas (LNG),

Barges

USCG Uses Skiff Ice Boat to Rescue Injured Man

The U.S. Coast Guard medically evacuated a man off of a dredging barge in Lake Erie near Sandusky, Ohio, Wednesday evening. At approximately 5:45 p.m., a good

New Tank Barge Delivered to Harley Marine

The newly built tank barge, the Fight A.L.S., was delivered to Harley Marine Services on February 19, 2016.   Designed by Elliott Bay Design Group (EBDG) and constructed at Vigor Fab in Portland,

AWO, Stakeholders 'Barge In' at Capitol Hill

American Tugboat, Towboat and Barge Industry Urged Support for American Jobs, Vessel Discharge Reform, and Waterways Infrastructure.   Members of the American Waterways Operators,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0670 sec (15 req/sec)