Qatargas Gains Two New LNG Vessels

Monday, November 05, 2007
Two new LNG vessels that will join the Qatargas fleet have been handed over to the owners’ consortium by Daewoo Shipbuilding & Marine Engineering Ltd (DSME) at its ship building yard in the Geoje Island in South Korea. The vessels Al Ruwais and Al Safliya will now proceed with bunkering and leave South Korea in the next few days. The first cargo will be delivered to Japan using one of these vessels before the year end. Two more vessels are expected to be delivered from other South Korean yards this month. Qatargas has chartered the ships from the vessel owners under a consortium of Nakilat, Pronav and some German investment companies. [Source: http://www.gulf-times.com]
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Container Manufacturer Reports Profit Plunge

World-leading container manufacturer and logistics services provider Singamas Container Holdings Limited (Singamas) has  announced its unaudited interim results for the six months ended 30 June 2014.

CACI Named MSC Logistics Prime Contractor

CACI International Inc says it has been selected as a prime contractor to provide logistics support to the U.S. Navy’s Military Sealift Command (MSC) on the Worldwide

Iconic Star Ferry in Move to New Wan Chai Pier

With effect from the first departure on Saturday 30 August 2014, Hong Kong's “Wan Chai – Tsim Sha Tsui” ferry service will operate from the new Wan Chai Ferry Pier.

LNG

Banking on US Shale Gas Boom, Asia Petrochemical Firms Switch to LPG

Asia petrochemicals firms are building tanks and retooling plants to store and process liquefied petroleum gas imported from the United States, counting on a flood

Mozambique: $30b Invested for 2018 LNG Export

More than $30 billion will be invested initially in Mozambique's natural gas sector to build capacity to produce 20 million tonnes per year of liquefied natural gas (LNG),

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1547 sec (6 req/sec)