QM2 Delivered

Monday, December 22, 2003
Cunard officially took delivery today of Queen Mary 2 -- the largest (151,400 tons), longest (1,132 feet/345 metres), tallest (236 feet/72 metres), widest (135 feet/41 metres) and most expensive ($800 million) ocean liner ever built. Queen Mary 2 is the first true transatlantic liner to have been built since the line's legendary Queen Elizabeth 2 entered service in May 1969. The historic ceremony at the Chantiers de l'Atlantique shipyard here included the symbolic changing of the flag where the Blue ensign and the Cunard house flag -- a gold lion rampant on a red background -- were raised. Queen Mary 2 then officially became a Cunarder, carrying the Cunard name, with its associated heritage and traditions, into the future. The ceremony also included a celebratory lunch on board for 600 guests. According to Pamela Conover, Cunard Line's president and chief operating officer, "Queen Mary 2 is the most extraordinary passenger liner ever built and is destined to be the most famous ship in the world. The superb quality and exacting care with which she was built will ensure that she is the ultimate in ocean travel for years to come." Patrick Boissier, chairman and CEO of Chantiers de l'Atlantique, said: "Today is a proud day for all of our employees and partners associated with this magnificent vessel. Without question, Queen Mary 2 is the new benchmark for shipbuilding excellence. She will be our best ambassador on the seas."

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Ship Conversion: Offshore Survey Vessel to Become a Flotel

Dutch shipowner C-Bed has contracted Wärtsilä Ship Design to supply the design for rebuilding its Seismic Survey Vessel, the Viking II, for use as a hotel vessel

Deepwater Downturn: Bump in the Road or Long-Term Slowing of Growth?

IMA/World Energy Reports has just completed a comprehensiveassessment of the five year outlook for the deepwater sector.  The new report – the 19th annual floater

Tidal Energy from Deep and Slow Waters

Deep Green, an underwater kite construction from the Swedish company Minesto, is set to be deployed in 2017 at the Holyhead Deep site off the coast of Anglesey, Wales.

Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0654 sec (15 req/sec)