Queen Mary 2 Sets Sail with GE LM2500s

Tuesday, January 13, 2004
The world’s largest transatlantic liner, the Queen Mary 2, set sail on its maiden voyage powered by two GE LM2500+ aeroderivative gas turbine-generator sets and four diesel generator-sets. The new flagship of the British merchant fleet, owned by Cunard Line, will take 14 days to sail from Southampton in the United Kingdom to Fort Lauderdale, Fla. A special highlight of Queen Mary 2’s inaugural schedule will be her maiden eastbound crossing from New York on April 25 as both Queen Mary 2 and Queen Elizabeth 2 sail in tandem. This will be the first time two Cunard Queens will have berthed in the port together since March 1940.

“We are delighted that our LM2500+ gas turbines were selected to power this elegant and historic achievement in naval architecture and engineering,” said Karl Matson, general manager of GE Marine. “This project also marks a milestone for GE, as the LM2500+ gensets are being used for the first time in a ‘dual gas turbine’ installation on a cruise ship in a combined diesel and gas turbine arrangement. The powerful LM2500+s enable the ship to meet its maximum speed of 30 knots,” Matson added.

Gas Turbines

The two GE LM2500+ aeroderivative gas turbine-generators for the Queen Mary 2 are used in a COmbined Diesel And Gas (CODAG) propulsion system with four diesel generator-sets. The gas turbines were manufactured at GE Marine’s Evendale, Ohio facility; the generator sets were packaged by GE Energy in Houston, Texas.

Each gas turbine-generator set contributes 25 megawatts to the ship’s overall 118 megawatts of installed power. Power produced in this electric drive configuration is used for propulsion as well as onboard power. GE specially designed the two LM2500+ packages for Chantiers de l’Atlantique, the Queen Mary 2 shipyard, to be some 35 tons lighter than previous LM2500+ marine gas turbine installations. According to Chris Dalston, manager of commercial marine sales for GE Energy, “What makes this application unique is that the compactness and low noise and vibration characteristics of the packages. These design features allowed the shipbuilder flexibility, especially with respect to the placement of the gas turbine gensets. The volume and weight of ducting for the combustion intake, exhaust and package ventilation are significantly reduced, thereby increasing the ships’ available space for cabins and public areas.”

The redesigned package also features the next-generation Woodward Micro Net Digital Control turbine control system. The controls manage all the systems of the package, including engine fuel management, package sequencing, package condition monitoring and interfacing to other systems aboard the ship.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

CTruk OWSV Enhanced with Volvo IPS

Since the launch of its first-of-class CTruk MPC22 late last year, the East Anglia-based workboat designer and builder informs it has incorporated performance feedback

Caterpillar, Uptake to Create Analytic Solutions

To help customers around the world better understand the health of their equipment and optimize machine availability, Caterpillar Inc.today announced it has

Gulf of Mexico Sees First LNG-powered OSV

A special Offshore Supply Vessel (OSV) has been delivered to Shell for its deepwater operations in the Gulf of Mexico.   The vessel, Harvey Energy, is chartered

Navy

India's Naval Help to Small Indian Ocean Nations

Indian Prime Minister Narendra Modi assigned senior officials in the Ministry of Defence with a task to “identify” and “support” maritime needs of smaller nations

Australia Announces Patrol Boat Tender

Tender announced for Pacific Patrol Boat Replacement Project   The Australian Government announced a Request for Tender (RFT) to replace the Pacific Patrol Boats

6 NATO Ships Begin Joint Black Sea Exercise

Six NATO warships, including Turkish, Bulgarian and Romanian vessels, have arrived to the Black Sea to start joint training exercises.    NATO ships assigned

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1197 sec (8 req/sec)