Refitted Boat Returns to Estuary Services

Tuesday, December 03, 2002
Estuary Warden a VT Halmatic Nelson 48/50 pilot boat has recently been delivered back to Estuary Services Ltd following a thorough mid-life refit at VT Halmatic’s Portchester Shipyard. The Pilot Cutter first entered service in 1992 and has been in continuous service ever since in the busy approaches to the Thames Estuary and Medway Ports. The craft was weighed and inclined pre-contract to ensure that design changes would not increase the VCG or change the LCG as Estuary Services Ltd were pleased with the sea keeping and handling of the craft. Weighing and inclining post re-fit confirmed that both all up weight and VCG had been reduced and sea trials confirmed the craft had retained its good sea keeping and handling characteristics. The comprehensive refit focused on the major systems and structure. The original diesel engines were replaced with new Caterpillar 3406E marine diesels (rated at 550 bhp @ 2100 rpm) coupled to overhauled ZF BW155A gearboxes to provide a service speed of 22 knots. New silicon element Vulastik couplings were fitted between the engines and gearboxes. Teignbridge supplied new 5 blade propellers that have been designed to provide good acceleration and smooth running characteristics. Twin single lever electric cruise command engine and gearbox controls have been fitted to give precise handling and ‘soft’ gear engagement to prolong the life of the gearboxes. The electronic engine management system provides full multi-function digital displayed information at the helm console which can be interrogated with a laptop computer. In addition the vessel is fitted with a real time data logger which is interfaced with the GPS. VT Halmatic and Estuary Services Ltd worked closely together to develop significant modifications which are intended to reduce in-service operational costs and improve the reliability and maintainability of the craft. Major items include: · The installation of the NIBS elastomer fender system on the forward boarding shoulders and the aft quarters. · The replacement of the outdated Halon fire smothering system with an MCA approved Pyrogen system. · Installation of VT Halmatic developed fuel traps to enable the vessel to operate safely at lower fuel levels. Combined with a 17% saving due to more efficient engines this significantly reduces the number of times the craft has to refuel. · New heating and de-misting systems with improved fresh air ventilation. · New man-over-board recovery platform. · A custom developed exhaust system supplied by Halyard that has proved very effective in reducing sound levels and achieving low engine back pressure levels. · Increased engine room ventilation with new aft deck ventilators and Elta 12” brushless fans.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

NYK Line Joins PNW West Coast Metro Pool

Effective October 20, 2014, NYK Line has become a member of the PNW West Coast Metro Pool (WCMP) operated by Trac Intermodal. The WCMP operates chassis at all major marine terminals,

ISS Manages Heavy-lift Project at Port of Mombasa

Inchcape Shipping Services (ISS) announced it has completed another complex heavy-lift project in Africa, this time at the Port of Mombasa in Kenya. ISS was

Environmental

Court Dismisses Boating Industry’s Challenge to EPA Misfueling Rule

The National Marine Manufacturers Association (NMMA) said it is disappointed with the U.S. Court of Appeals decision released on Tuesday, October 21, 2014 for the D.

New Dual Use Piracy Barrier Launched

Guardian Maritime launched Guardian Greenwater, a new product that was developed to deal with the issue of greenwater on-board deck following turbulent weather conditions,

Australia Join Operation RENDER SAFE

Australian Defence Force (ADF) personnel have arrived in Bougainville to address a potentially deadly legacy posed by unexploded ordnance from past conflicts as part of Operation RENDER SAFE 2014.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 4.9226 sec (0 req/sec)