RFP Out to Dredge Panama Canal Entrance

Tuesday, March 03, 2009

On-schedule with the Expansion Program timeline, the Panama Canal Authority (ACP) announced on March 2, the Request for Proposals (RFP) to dredge the Canal's Atlantic entrance.

The contract includes the dredging of approximately 15 million underwater cubic meters and 800 thousand cubic meters of dry excavation. It also includes deepening the Canal's Atlantic entrance to 15.5 meters to allow the transit of post-panamax vessels through the new set of locks that will be constructed under the Expansion Program.

With the announcement of the RFP, potential contractors will be allowed a period of three and a half months to evaluate site conditions and one month to submit their proposals. The contract will be awarded under the lowest price model. Proposals are expected to be submitted on July 15, 2009 with the project completion expected sometime in the second quarter of 2013.

In another related development, global transport leaders, contractors, consultants and researchers joined the ACP today for “Connecting the World Through Dredging,” an international seminar on sustainable dredging and maritime construction.

Two foremost international dredging associations are in Panama for this event.  The Central Dredging Association (CEDA), which serves Africa, Europe and the Middle East, along with the Western Dredging Association (WEDA), which covers North, Central and South America, organized their first-ever dredging seminar, hosted by the ACP.

Held at the Ascanio Arosemena Complex in Panama City, the one-day conference featured presentations from ACP, CEDA and WEDA experts and covered a number of issues related to the Canal expansion project. Topics include: sustainable navigation and commerce, the environment and planning, execution and dredging for sustainable infrastructure.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Dredging

Van Oord acquires 100% control of Dravo

Van Oord has acquired all shares of its Spanish subsidiary Dravo S.A.  Dravo S.A. has been owned, since 1987, by Van Oord (50%) and the Spanish company Dragados S.

US FMC Commissioner Visits Panama Canal Expansion Sites

Counsel to the U.S. Federal Maritime Commission informs that  Commissioner William P. Doyle has recently surveyed the construction site on a visit to the Pacific-side of the expanded Panama Canal.

Construction of Changi East Finger Extension

The working period for the construction of Changi East Finger Extension has been extended, GAC said in its daily Hot Port News report. The works will now be conducted from April 25 to October 24,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Pipelines Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0714 sec (14 req/sec)