Rhapsody Of The Seas Begins Sailing From Tampa

Monday, January 07, 2002
The first Royal Caribbean International ship to sail regularly from the Port of Tampa, Rhapsody of the Seas, began sailing from there on January 5. The ship will sail from Tampa on January 5, 12, 19, 26, and February 2, 16, 2002, on five seven-night and one six-night Western Caribbean sailings with ports of call at Costa Maya and Cozumel, Mexico; Georgetown, Cayman Islands; and Key West, Florida. On February 9, 2002, Rhapsody of the Seas will make a special seven-night cruise to New Orleans for Mardi Gras.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Kvaerner in Statoil Unmanned Platform Project

Kvaerner say that Statoil has awarded it a concept study related to a standardised, unmanned dry tree wellhead platform for the Oseberg Future Development project.

CACI Named MSC Logistics Prime Contractor

CACI International Inc says it has been selected as a prime contractor to provide logistics support to the U.S. Navy’s Military Sealift Command (MSC) on the Worldwide

DoD Awards US$117-M New Orleans Dredge Contract

The US Department of Defense informs that it has awarded Boh Bros. Construction Co., LLC, New Orleans, Louisiana, a US$116,956,672 firm-fixed-price contract with

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0818 sec (12 req/sec)