River Dee Shiprepairers Take on Work for OSV

Wednesday, September 24, 2003
Drydock planning is always difficult, and shipyards have to show a great deal of flexibility to their customer’s requirements when it comes to meeting essential redelivery schedules. This is particularly relevant in River Dee Shiprepairers, Aberdeen, part of the A&P Group, where only one graving dock (112.80 m x 21.33 m) is in operation. The yard is currently carrying out an eight day general repair to Gulf Offshore’s OSV (Offshore Supply Vessel) Highland Warrior, work including removal and inspection of the vessel’s two tailshafts; HP washing of the hull and painting with International’s Interspeed. When the repair to the Highland Warrior is complete, another OSV is due to enter the drydock – North Star Shipping’s Grampian Highlander, work also to include tailshaft removal and repair. The flexibility of the shipyard is then brought into play as Caledonia Shipping’s OSV Caledonia Master is due in for a 13/14 day drydocking, including starboard tailshaft removal and general repairs. So, with the owner’s permission, the tailshaft and propeller onboard the Grampian Highlander will be removed and the shaft tunnel blanked off in drydock and the ship refloated and moored alongside, which will allow for the Caledonia Master to be drydocked. The Grampian Highlander’s tailshaft is then due to be sent to RK Atkinson (specialist tailshaft repairers), located in North Humberside, and, by the time it is returned to the shipyard, the repairs to the Caledonia Master will be complete.
Email AddThis Feed Button Share
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Dutch Shipbuilders Held Fast in Difficult 2012

The Holland Shipbuilding Association say that the various shipbuilding sectors presented a mixed picture in the past year, ship repair & supereyact construction did well, not so large new-buildings.

Steelwork Preparation Specialists Open Minnesota Facility

Blast-One industrial solutions for OEM, shipyards, steel fabrication, and machine & equipment refurbishing open new manufacturing division. Ohio based Blast-One

Marinette Marine Completes $74 Million Shipyard Improvements

On Monday, May 20, Marinette Marine Corporation (MMC) of Fincantieri Marine Group, held a ribbon cutting ceremony to commemorate the opening of the company’s newest

Navy

Austal-built JHSV 2 Completes Navy Acceptance Trials

Joint High Speed Vessel 'USNS Choctaw County' (JHSV 2) has successfully completed Acceptance Trials in the Gulf of Mexico. This milestone achievement involved

Northrop Get Navy 'Star Wars' Laser Contract

The U.S. Navy selects Northrop Grumman for the initial phase of the Solid State Laser Technology Maturation (SSL-TM) program. SSL-TM is a research and development project to mature solid-state,

Today in U.S. Naval History: May 21

Today in U.S.Naval History - May 21 1850 - Washington Navy Yard begins work on first castings for the Dahlgren guns 1917 - USS Ericsson fires first torpedo

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright