River Dee Shiprepairers Take on Work for OSV

Wednesday, September 24, 2003
Drydock planning is always difficult, and shipyards have to show a great deal of flexibility to their customer’s requirements when it comes to meeting essential redelivery schedules. This is particularly relevant in River Dee Shiprepairers, Aberdeen, part of the A&P Group, where only one graving dock (112.80 m x 21.33 m) is in operation. The yard is currently carrying out an eight day general repair to Gulf Offshore’s OSV (Offshore Supply Vessel) Highland Warrior, work including removal and inspection of the vessel’s two tailshafts; HP washing of the hull and painting with International’s Interspeed. When the repair to the Highland Warrior is complete, another OSV is due to enter the drydock – North Star Shipping’s Grampian Highlander, work also to include tailshaft removal and repair. The flexibility of the shipyard is then brought into play as Caledonia Shipping’s OSV Caledonia Master is due in for a 13/14 day drydocking, including starboard tailshaft removal and general repairs. So, with the owner’s permission, the tailshaft and propeller onboard the Grampian Highlander will be removed and the shaft tunnel blanked off in drydock and the ship refloated and moored alongside, which will allow for the Caledonia Master to be drydocked. The Grampian Highlander’s tailshaft is then due to be sent to RK Atkinson (specialist tailshaft repairers), located in North Humberside, and, by the time it is returned to the shipyard, the repairs to the Caledonia Master will be complete.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

US Funding for Air Emissions/Alternative Energy Projects

The U.S. Maritime Administration (MARAD) announced that up to $1.3 million in Federal funding is now available through cooperative agreements for projects supporting

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

Navy

Libyan War Plane Bombs another Tanker

A fighter jet operated by Libya's military force backed attacked an oil tanker that was about to anchor in the northern city of Sirte, reports local media.   Lt Gen.

US Navy Submarine to be Named USS New Jersey

The U.S. Navy's next Virginia-class attack submarine will bear the name USS New Jersey, says AP reports.   U.S. Secretary of the Navy Ray Mabus hosted a ship-naming

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Pipelines Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1525 sec (7 req/sec)