River Ems Passage to Start in mid September

Thursday, August 09, 2007
Upon completion of tests and engine trials the 93,500 gt cruise ship Norwegian Gem will leave the covered building dock of Meyer Werft on Sunday, August 12. Undocking of the ship, which is built for the American cruise operator Norwegian Cruise Line (NCL). With the ship being berthed at the outfitting pier, outstanding work will be completed on board. The Ems passage of the newbuilding to the sea trials port in Eemshaven/Netherlands is planned for mid of September 2007. A detailed schedule will be published within short. The new luxury liner has a length overall of 294.13 m, is 32.2 m wide and reaches a speed of more than 24 knots. More than 2,400 passengers can be accommodated in 1,197 cabins and are taken care of by a crew of about 1,100.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Cruise Ship Returns to Texas after Ebola Concern

The Carnival Magic cruise ship was en route back to the United States on Saturday with a passenger from Texas who might have handled specimens of the first Ebola

Kiel's 2014 Cruise Shipping Season Ends

Expanded terminal capacities created at Berth 1 This year’s cruise shipping season in Kiel closes on the evening of October 18 when the AIDAcara sets sail for the Canary Islands.

Cruise Ship Passenger Isolated Due to Ebola Risk

A Texas hospital employee who may have handled lab specimens from an Ebola victim has entered voluntary isolation on board a Carnival cruise ship in the Caribbean.

LNG

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

LNG America, Buffalo Marine to Design LNG Bunker Fuel Network

LNG America announced it has entered an agreement with Buffalo Marine Service, Inc. (Buffalo Marine) to cooperate on the design of an LNG bunker fuel network for the U.

World’s 1st LNG Hybrid Barge Christened "Hummel"

The world’s first LNG hybrid barge of Becker Marine Systems was christened with the name "Hummel" on October 18, 2014, at Grasbrook Quay in HafenCity Hamburg.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1180 sec (8 req/sec)