Rowan Reports Fleet Status Following Ike

Tuesday, September 16, 2008

Rowan Companies has completed an initial aerial survey of its nine rigs in the . All of the Company's rigs were on location, with the exception of the Rowan-Anchorage. The Company is undertaking efforts to locate the rig but believes it may have capsized and sunk at its pre-storm location offshore . All appropriate regulatory agencies have been notified.

In addition, Rowan's facility encountered a significant storm surge and is expected to be out of commission for some time. The Company's newbuild jack-up, Rowan-Mississippi, which is stationed there for final outfitting, was apparently struck by another vessel during the storm. The Company's initial assessment is that the damage is limited and should not delay the rig's scheduled delivery.

Rowan's other rigs in the Gulf Coast area appear to have sustained minimal damage but a complete evaluation of their condition will require a closer inspection upon the return of the Company's drilling personnel. Crew members have begun returning to their assigned rigs and normal operations should resume as soon as possible.

The Rowan-Anchorage was a LeTourneau 52-class slot jack-up rig. The rig had been secured at its pre-storm location in Vermillion Block 201 and all personnel were evacuated prior to the arrival of Hurricane Ike. It was insured for $60 million, less a $17.5 million windstorm deductible, and had a carrying value of approximately $4.5 million. The rig had been operating under a well-to-well contract at a day rate of approximately $60,000.

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


SBM Offshore Says Petrobras Discussions Ongoing

Floating production services provider SBM Offshore responded to media reports of a potential settlement with Petrobras regarding tenders in Brazil, stating the

Shell Starts Bonga Phase 3 in Nigeria

Shell Nigeria Exploration and Production Company Ltd (SNEPCo) announced the start-up of production from the Bonga Phase 3 project.   Bonga Phase 3 is an expansion of the Bonga Main development,

Workers Evacuated After Gas Leak at Mexico Platform

Mexico's state-owned oil company Pemex said on Tuesday that it was working to control a gas leak at the Sihil A platform in the Gulf of Mexico.   Eighty-five workers have been evacuated,

Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1372 sec (7 req/sec)