Rowan Wins North Sea Contract

Monday, June 27, 2005
Rowan Companies won a term drilling contract for use of the Rowan Gorilla VII in the North Sea commencing in August 2005. The contract provides for a one-year term with a minimum work commitment of nine months, and includes an option for a second year. Rowan estimates that contract revenues, based on a one-year term, will be approximately $65 million. As previously reported, Gorilla VII is currently carrying out decommissioning activities on the Ardmore Field in the North Sea which the Company expects to conclude during July.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Bollinger Wins Contract for Phase II FRC Builds

Louisiana shipbuilder Bollinger Shipyards announced it has secured a contract to build Phase II of the Sentinel Class Fast Response Cutters (FRC) for the United States Coast Guard (USCG).

Massive Layoff Ahead for Hyundai Heavy

Another massive reduction in the Korean shipbuilding workforce may come as most shipyards are still struggling with falling orders and mounting losses, reports Yonhap quoting industry sources.

Daewoo Shipyard Posts Q1 Operating Loss

South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering Co. posted a first-quarter loss after incurring more costs to finish some offshore projects.   First-quarter

Offshore

Offshore Casualty: Harkand Group Collapses

As the prolonged slump in energy prices continues to drag on a number of oil and gas and maritime players, word has it that Harkand Group has succumbed, according to staff reports and a report on www.

Skandi Paraty Delivered and On-hire

Skandi Paraty, owned by Norskan Offshore Ltda, has been delivered from the yard and went on-hire on a four years contract with Petrobras.   Skandi Paraty is an AHTS,

ABB Transformers for the Most Powerful Wind Turbines

ABB will deploy 40 special transformers to equip wind turbines for an offshore wind farm in the Irish Sea. The MHI Vestas Offshore Wind turbines are 195 m (640

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0896 sec (11 req/sec)