Royal Caribbean Extends Options For Two $500 Million Vessels

Thursday, June 21, 2001
Royal Caribbean said on Wednesday it has extended for 13 months options on building two $500 million ships to add to its 21-vessel fleet.

The Miami-based operator of the Royal Caribbean International and Celebrity lines said in a news release that it had agreed with the Meyer Werft shipyard of Papenburg, Germany, to extend the options to July 26, 2002, on the so-called Radiance-class ships.

Both options on the 2,100-passenger ships were due to expire on June 27. Royal Caribbean's decision comes amid a dramatic increase in the world's cruise fleets blamed by many for sagging profitability in the sector.

The first of the new class, Radiance of the Seas, was launched in Miami last March and is sailing Alaskan routes this summer. A second Radiance-class ship, Brilliance of the Seas, is scheduled to begin sailing next year.

Two more of the Radiance-class ships, which are narrow enough to pass through the Panama Canal, remain on schedule for delivery to Royal Caribbean in 2003 and 2004, the company said. The options cover the fifth and sixth ships in the class.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Sulzer Shareholder has 5 pct Dresser-Rand Stake

Russian billionaire Viktor Vekselberg's Swiss investment firm Renova Group said on Friday it had a 4.99 percent stake in U.S.-based Dresser-Rand, which might become the object of a takeover battle.

MAN-Powered Cargo Vessel Meets Tier III

Classification society awards SCR system emissions certificate. MAN Diesel & Turbo has been awarded a Tier III - compatibility certificate by the DNV- GL classification

Transas Simulators Boosts Western Shipping Training Center

Transas Marine Pacific has successfully completed the upgrade of a simulator complex for Western Shipping Pte. Ltd. training center. The simulator class was

Cruise Ship Trends

Steel Cut for Third RCI Quantum-class Cruise Ship

The steel cutting for 'Ovation of the Seas', scheduled to be delivered in the autumn of 2016, took place at the Meyer Werft shipyard in Papenburg, Germany, where 'Quantum of the Seas',

Holland America Line's New Ship is ms Koningsdam

Holland America Line revealed the name of its new 99,500-ton cruise ship slated for delivery in February 2016 will be ms Koningsdam. While the name pays homage

L-3 MSI to Equip Third Quantum Class Ship

L-3 Marine Systems International (L-3 MSI) announced today that it has been awarded a contract to provide a range of navigation, lighting and communication systems

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Salvage Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1645 sec (6 req/sec)