Sea Jet Tests Advanced Water Propulsion

Monday, October 10, 2005

By Naval Surface Warfare Center Carderock Division Corporate Communications

The new Advanced Electric Ship Demonstrator (AESD) is expected to participate in trials on Lake Pend Oreille at the Carderock Division's Acoustic Research Detachment (ARD), Bayview, Idaho in mid-November. Recently christened Sea Jet, the 133-foot test platform houses a Rolls Royce Naval Marine advanced waterjet propulsion system, the AWJ-21, to improve surface ship efficiency and maneuverability by reducing noise and wake.

Capt. Charles Behrle, Commander of the Carderock Division, says his organization is truly gratified to be part of a major technological leap that the AESD brings to the U.S. Navy. He noted, "Having the AESD at the ARD in Bayview marks a new era for the work force in applying their submarine expertise to the Navy's surface ships."

The AESD resembles an early DD (X) design. The steel platform displacement is about 120 tons. It was built by Dakota Creek Industries, Inc. (DCI), Anacortes, Washington. A diesel generator powers two electric propulsion motors shafted to two waterjet pumps which are integrated with the hull below the waterline, with a 720-cell battery bank powering the motors for acoustic trials, eliminating the diesels as a noise source for quiet operations and high-speed tests. The AESD will have a crew of six and achieve top speeds of 8 knots on diesel, 16 knots battery power.

Carderock's Large Cavitation Channel in Memphis is the site of hydrodynamic investigations. The team will use a ½-scale mockup of the ¼-scale AESD, establishing AWJ-21 data, verifying propulsion characteristics and cavitation performance.

The hull sections were shipped and assembled at ARD's Model Engineering and Support Facility. Builder's trials and acceptance trials are scheduled, after which the Navy is planned to accept Sea Jet, with test work until March. Then another electric-drive propulsion system, RimJet, a pod on struts below the waterline, will be installed. Developed by Electric Boat, it eliminates shafting from within the hull. Researchers will remove the stern and add a RimJet aft section.

Other modifications include removing the aluminum deckhouse and installing a low-signature composite version for investigating radar signatures. The Office of Naval Research funded a high-resolution measurement array to collect data for quiet surface ship noise investigations, so the array's accuracy will be verified as well. A multi-year plan for Sea Jet is being developed.

The Navy is building on the years of knowledge and world class facilities used in testing model submarines and applying that knowledge to reduce the signatures of surface ships. The operations in shallow water and presence of low cost mines create a need to understand the acoustic and electro-magnetic signature generation and then ways to mitigate the effects. For the sponsors, this is a cost effective way to leverage the technology already in place for submarine testing. For the ARD it enables us to maintain the unique capabilities we have and apply them to benefit the Navy.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

EBDG Completes Repower of COLUMBIA

Elliott Bay Design Group (EBDG), a leading naval architecture and marine engineering firm with offices in Seattle, New Orleans and Ketchikan, Alaska today announced

Mexican Navy Delegation Visits NSSA

The U.S. Navy reported that its Norfolk Ship Support Activity (NSSA) welcomed the Mexican Navy Delegation to Building CEP-200, Naval Station Norfolk, Aug. 21 for

MN 100: Caterpillar Marine

Neumühlen 9 22763 Hamburg/Germany Tel: (713) 895-1449 Email: cat_power@cat.com Website: www.marine.cat.com Managing Director: Nigel Parkinson The Company: Caterpillar

LNG

MARAD: Total Fuel Cycle Study for Natural Gas

The Maritime Administration (MARAD) released a study that evaluates total fuel cycle emissions for natural gas versus conventional marine fuels. Results showed

LNG Transport Barge Design Approved by ABS

Conrad Shipyard, L.L.C. engaged Bristol Harbor Group, Inc. (BHGI) to develop a 3,000 cubic meter Liquefied Natural Gas (LNG) transport barge utilizing a Bristol

Banking on US Shale Gas Boom, Asia Petrochemical Firms Switch to LPG

Asia petrochemicals firms are building tanks and retooling plants to store and process liquefied petroleum gas imported from the United States, counting on a flood

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1125 sec (9 req/sec)