Seacor Repowers Vessels

Monday, June 26, 2006
Conrad's aluminum manager Todd Babin shows the "tweaked" props.

The 300-ton travel lift at Conrad Industries Morgan City facility is a major attraction to Gulf Coast crew boat operators. Shallow waters in the area add to the heavy usage that crewboats receive contributes to a steady demand for quick haul outs and timely below waterline repairs. The yards large upland area is another attraction as it provides ample storage space for vessels undergoing major overhauls. This latter is the case with a series of six vessels recently acquired by Seacor Marine as part of their larger take-over of the Seabulk fleet. The six crewboats were each powered by four electronically controlled 1100 hp two-cycle engines turning at 2100 RPM that were getting only about 6000 hours before requiring a rebuild.

Seacor decided to repower the vessels with Cummins KTA38 M1 engines that deliver 1100 hp at 1800 RPM. According to Seacor project manager Joe McCall, these engines will routinely deliver 25,000 hours between rebuilds. The repowers presented some challenges however. The smaller diameter shafts on the vessels would not handle the larger diameter props that the higher torque of the Cummins engines will deliver. To allow for this, explained Joe McCall, “We decided to tweak the props and turn the them faster so we have gone with a 2:1 reduction rather than the 2.36 and 2.55 reductions on the old 2100 RPM engines. Two of the boats had one reduction and the other four had the second. In June the Seabulk St. Tammany was undergoing the first change out of her four engines. The job will to be completed by the end of July with the other five boats scheduled over the coming months.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

Stolt-Nielsen Completes Bond Issues

Stolt-Nielsen Limited announced the placement of senior unsecured bonds in a total amount of NOK 1,100 million in a new five-year bond issue carrying a coupon of 3M NIBOR plus 4.

Icebreaker Murmansk Launched at Arctech Helsinki Shipyard

The 16 MW Icebreaker for the Russian Ministry of Transport was launched at Arctech Helsinki Shipyard on March 25th, 2015. Before floating the vessel, she was

Sino-Global Purchases First Tanker

Sino-Global Shipping America, which was recently listed on Nasdaq, is becoming a shipowner.   The shipping agency, logistics and ship management services company

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1975 sec (5 req/sec)