SeaDragon II to Get Corrosion Protection System

Wednesday, November 14, 2007
The second semi-submersible rig to be built for SeaDragon Offshore will have a hull corrosion protection system designed and supplied by Cathelco Jotun. The SeaDragon Offshore project involves the construction of two hulls which will be built in Russian yards and fitted out at Teesside in the U.K. The first of the semi-submersibles is already under construction at the Sevmash yard for completion in 2008. The second hull is to be built at the Vyborg yard and delivered to Teesside in 2009.

Cathelco Jotun is supplying an impressed current cathodic protection system for the SDO II semi-submersible. Both of the pontoons will have two transformer/ rectifiers serving a number of hull mounted anodes and reference cells to achieve the optimum current distribution.


Offshore

US Offshore Lease Sale Yields $18 Mln in High Bids

Today’s U.S. oil and gas Lease Sale 248 garnered $18,067,020 in high bids for 24 tracts covering 138,240 acres in the Western Gulf of Mexico Planning Area, announced

Canada May Ask Far-offshore Drillers to Pay Extra

Canada may ask oil companies to contribute to the hundreds of millions of dollars or more the country has to pay to an international body if they drill far offshore,

MISC Enters Thai Offshore O&G Market

Energy related maritime solutions and services provider MISC Berhad (MISC) has made inroads into Thailand’s offshore oil and gas market for the first time.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0713 sec (14 req/sec)