Seaway Pre-Entry Notification Required

Thursday, March 05, 2009

On March 4, the Great Lakes / St. Lawrence Seaway System issued a notice stating that all foreign flagged vessels intending to transit the Seaway must submit a complete Notice of Arrival (NOA) 96 hours prior to entering the Seaway at Call In Point 2 (CIP 2). The NOA must be provided electronically following the USCG National Vessel Movement Center’s (NVMC) procedures and using either a website (http://www.nvmc.uscg.gov), eXtensible Markup Language format (XML schema), or InfoPath application.

To complete the NOA correctly for the Seaway, CIP2 shall be selected as the Arrival Port, Foreign to Saint Lawrence Seaway shall be selected as the Voyage Type, and Saint Lawrence Seaway – Transit shall be selected as the Arrival State, City and Receiving Facility.

As a reminder, if calling on a U.S. port, an additional NOA must be submitted to the NVMC in accordance with 33 CFR 160, subpart C.

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navigation

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

El Nino Onset May Impact Panama Canal Drafts

The Panama Canal Authority closely monitors the water levels of Gatun and Alhajuela lakes on a regular basis due to the importance that these resources have for transit operations.

Egypt Says Finishes Work on New Suez Canal

Egypt has finished building its New Suez Canal, its overseer said on Wednesday, a project President Abdel Fattah al-Sisi sees as a symbol of national pride and

Maritime Security

Pressure for Australia Sub Deal Grows

Australia to spend A$65 bln on ships and subs over 20 years; PM pledges A$40 bln for domestic shipbuilders. Australia will spend A$89 billion ($65 billion) on

Asian Nations Call for Stop to South China Sea Land Work

Calls grow for China to halt land reclamation. Southeast Asian countries on Tuesday backed a U.S. call to halt land reclamation in the South China Sea, underlining

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Port Authority Salvage Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2471 sec (4 req/sec)