Ship Concept Study Delivered to Navy

Friday, February 07, 2003
Gibbs & Cox, Inc. have delivered their Focused Mission High Speed (FMHS) Ship Concept Study to the United States Navy. The FMHS concept design is the result of a 90-day contract awarded to the Gibbs & Cox, Inc. FMHS Team by the U.S. Navy on November 8, 2002. The results of the study show that the Gibbs & Cox, Inc. FMHS Team design meets or exceeds the general guidance and requirements (top speed, performance in a seaway, signatures, aviation capability, high speed endurance and modularity) within the $220 Million target budget. The Gibbs & Cox FMHS Team design philosophy emphasized the use of state of the art, proven technology to reduce technical and cost risk, minimize developmental requirements, meet the CAIV target goal, and allow the ship to be built in the timeframe envisioned for the FMHS. The design concept documented in the Final Report employs many innovative features to provide the lift and volume for the missions involved, while providing ample space for the modular mission systems envisioned.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Textron Awarded $22-M Navy LCAC Contract Modification

The US Department of Defense informs that Textron Inc., New Orleans, Louisiana, is being awarded a $21,904,620 modification to a previously awarded contract (N00024-12-C-2401)

EU to Help Italy Cope with Boat Migrants

The European Commission said on Wednesday it would launch an EU version of Italy's sea rescue operation to help it deal with the droves of migrants crossing the

Today in U.S. Naval History: August 27

Today in U.S. Naval History - August 27 1917 - Squadron of minesweepers departs U.S. for service off France 1944 - USS Stingray (SS-186) lands men and supplies on Luzon,

Education/Training

USCG Shares Safety Tips for Labor Day, Riverfest

Labor Day weekend marks the unofficial end of the boating season and is known as one of the busiest recreational boating weekends on the Ohio River. With approximately 2,

March on Stress Assesses MPHRP's care

Professor Neil Greenberg of March on Stress at the Institute of Psychiatry, King's College London, visited the Philippines to assess the competencies of mental

Crane Operator Alert: Certification Requirement

Although OSHA Stakeholders have voted to extend the final deadline in four different meetings, the deadline has not been officially extended by US Government agency OSHA as of yet,

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0997 sec (10 req/sec)