Ship Engineers Sentenced for False Statements

Tuesday, January 18, 2005
Thomas L. Sansonetti, Assistant Attorney General for the Justice Department’s Environment and Natural Resources Division, and Paula D. Silsby, United States Attorney for the District of Maine, announced today that two chief engineers of a freighter ship were each sentenced yesterday to two years of probation and a fine of $3000 for their roles in concealing the overboard ocean dumping of waste oil from the M/V Kent Navigator through false log books and statements designed to deceive the U.S. Coast Guard. The defendants, Chief Engineers Alfredo D. Lozada and Felipe B. Arcolas, worked aboard the Kent Navigator, which is owned and operated by Petraia Maritime Ltd. The government’s investigation began when the U.S. Coast Guard received an anonymous tip that a vessel bound for Portland, Maine was illegally discharging its waste oil and its bilges while at sea. MARPOL, which is a treaty ratified by the United States, and U.S. law limit the oil content of discharges from ships to no more than 15 parts per million. Oil pollution control equipment, called an Oil Water Separator, is equipment required by these laws that, when operated correctly, will prevent discharges of oil in excess of 15 parts per million. The Coast Guard inspected the Kent Navigator when it entered the port and found oily residue in piping that led to overboard discharge valves and inoperable oil pollution control equipment. The Coast Guard’s investigation revealed that while the vessel was at sea, Lozada and Arcolas directed the ship’s crew to discharge waste oil tanks and bilge tanks directly overboard, and also discharged the bilges in a way that circumvented the ship’s Oil Water Separator. These discharges were made in the middle of the night while at sea, and resulted in discharge of significant quantities of oil. To conceal this activity Arcolas and Lozada falsified records in the ship’s Oil Record Book making it appear as if the discharges were made using the required pollution control equipment when in fact they were not. An Oil Record Book is a pollution record required by MARPOL and U.S. law that is regularly inspected and relied upon by the Coast Guard, which was presented for review during the Coast Guard’s inspection. They also made false statements to the Coast Guard while in port that the ship’s pollution control equipment functioned properly. U.S. District Judge D. Brock Hornby also ordered that Lozada and Arcolas spend the first month of their probation confined to their temporary residence in Portland where they have been living since they were removed from their ship last summer by the Coast Guard and charged with making false statements. The two will be allowed to return to their homes in the Philippines to serve out their probation terms, subject to U.S. court supervision. The investigation was conducted by the U.S. Coast Guard Investigative Service with assistance from the Coast Guard Marine Safety Office, the Coast Guard First District Legal Office, and the Coast Guard Head Quarters Office of Investigation and Analysis. The case was prosecuted by the Environmental Crimes Section of the Department of Justice and U.S. Attorney’s Office for the District of Main. The investigation is continuing. Source: HK Law
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

New Binding Law of The Sea Agreement Advanced

WOC Sustainable Ocean Summit (Singapore, 9-11 November 2015) Will Enable Industry to Organize its Input to this Major New Ocean Treaty Development The U.N.

Oceans Can’t Take Any more: Researchers Fear Fundamental Change

Our oceans need an immediate and substantial reduction of anthropogenic greenhouse gas emissions. If that doesn’t happen, we could see far-reaching and largely

Teekay LNG Partners Declares Distribution

Teekay GP LLC, the general partner of Teekay LNG Partners L.P. has declared a cash distribution of $0.70 per unit for the quarter ended June 30, 2015. The cash distribution is payable on August 14,

Offshore

Technip Samsung JV Wins 2 FLNG Project Contracts

The Browse project covers the realization and installation of three FLNG units to develop the Brecknock, Calliance and Torosa fields in the Browse Basin, 425 kilometers North of Broome,

Fjords Processing Bags Johan Sverdrup Contracts

Fjords Processing, headquartered in Norway (Fornebu), has won three contracts for the deliveries of process systems for the Johan Sverdrup development in the North Sea.

Ocean Safety, Richard Irvin Marine Safety Merger

Ocean Safety has today announced the merger with Richard Irvin Energy Solutions Marine Safety Division and their Aberdeen branch.   This merger follows the

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2367 sec (4 req/sec)