Ship Removed from Reef, Sunk

Monday, August 08, 2005
HONOLULU - The 145-foot motor vessel Casitas, which ran aground at Pearl and Hermes Atoll on July 2, has been successfully extracted from the reef and entombed northwest of the atoll in approximately 7,200 feet of water, the Unified Command announced.

“On behalf of all the parties involved, we are very pleased to see this operation safely completed,” said U.S. Coast Guard Captain Manson Brown, Federal On-Scene Coordinator for the Unified Command. “The Unified Command shared a common commitment to remove the potential pollutants and extract the vessel from the reef with no human injuries and as little damage to the environment as possible. Given the remote location and the significance of the reef ecosystem, it was a challenge – a challenge we can now say we met.”

The Casitas was pulled off the reef at 11:31 a.m. Thursday morning. The operation began early in the morning as ballast water was pumped from the Casitas to refloat the vessel. Additional holes in the hull were patched and pumps were kept operating to keep the Casitas afloat until it reached an approved disposal site at approximately 1:35 p.m.

Earlier, approximately 1,850 gallons of gasoline were transferred from the Casitas to the 240-foot barge serving as the operations base for the extraction. Equipment and personal gear were also removed from the Casitas. Because of safety concerns, about 15 tons of marine debris and other trash were left on the vessel but stowed in sealed, double-hulled holds. Entombment of this type is not unusual.

The successful entombment of the Casitas ends this phase of the operation. In the near future, a team of representatives from State of Hawaii, National Oceanic and Atmospheric Administration, U.S. Fish and Wildlife Service, and responsible party will gather at Pearl and Hermes Atoll to begin assessing injuries to the atoll’s natural resources.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Sjo Resigns from Polarcus Board of Directors

Polarcus Limited announced that Hege Sjo will resign from its board of directors effective February 2, 2015.   Sjo has accepted an appointment as Deputy Director

BOEM Issues Supplemental Environmental Impact Statement

The U.S. Department of the Interior, Bureau of Ocean Energy Management (BOEM), announces the availability of the Draft Supplemental Environmental Impact Statement

Europe's Offshore Wind Capacity Growing

New capacity edges down 5 pct from record 2013; industry body forecasts stable growth over 2015/6. Europe's offshore wind capacity kept up a steady rate of growth

Casualties

Maintenance Woes Led to Digby Ferry Grounding

Maintenance deficiencies and inadequate emergency procedures led to November 2013 grounding of Princess of Acadia in Digby, Nova Scotia    Maintenance deficiencies

Dozens Missing off Bangladesh after Boat Sinks

About 40 illegal migrants heading from Bangladesh to Malaysia to look for work were missing on Thursday after their boat sank, police said. A steady stream of

USCG Rescue 2 on Bahamian Island

Two stranded men are safe after the Coast Guard rescued them off an Island in the Bahamas Tuesday afternoon. Coast Guard 7th District watchstanders received

 
 
Maritime Careers / Shipboard Positions Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1124 sec (9 req/sec)