Ship Removed from Reef, Sunk

Monday, August 08, 2005
HONOLULU - The 145-foot motor vessel Casitas, which ran aground at Pearl and Hermes Atoll on July 2, has been successfully extracted from the reef and entombed northwest of the atoll in approximately 7,200 feet of water, the Unified Command announced.

“On behalf of all the parties involved, we are very pleased to see this operation safely completed,” said U.S. Coast Guard Captain Manson Brown, Federal On-Scene Coordinator for the Unified Command. “The Unified Command shared a common commitment to remove the potential pollutants and extract the vessel from the reef with no human injuries and as little damage to the environment as possible. Given the remote location and the significance of the reef ecosystem, it was a challenge – a challenge we can now say we met.”

The Casitas was pulled off the reef at 11:31 a.m. Thursday morning. The operation began early in the morning as ballast water was pumped from the Casitas to refloat the vessel. Additional holes in the hull were patched and pumps were kept operating to keep the Casitas afloat until it reached an approved disposal site at approximately 1:35 p.m.

Earlier, approximately 1,850 gallons of gasoline were transferred from the Casitas to the 240-foot barge serving as the operations base for the extraction. Equipment and personal gear were also removed from the Casitas. Because of safety concerns, about 15 tons of marine debris and other trash were left on the vessel but stowed in sealed, double-hulled holds. Entombment of this type is not unusual.

The successful entombment of the Casitas ends this phase of the operation. In the near future, a team of representatives from State of Hawaii, National Oceanic and Atmospheric Administration, U.S. Fish and Wildlife Service, and responsible party will gather at Pearl and Hermes Atoll to begin assessing injuries to the atoll’s natural resources.

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

DNV GL Targets Safer Approach to Subsea Lifting

The completion of a joint industry project (JIP) to improve existing standards and regulations around subsea lifting operations has resulted in a new recommended practice (RP).

Polarcus Awarded 3D Project Off West Africa

Polarcus Limited has signed a letter of intent with Perenco Oil & Gas Gabon S.A. for a 3D marine seismic acquisition project offshore West Africa.   The project,

Boskalis, VolkerWessels Win Offshore Wind Farm Work

Royal Boskalis Westminster N.V., in partnership with Volker Stevin International (VolkerWessels), has been awarded a contract by Iberdrola Renewables Offshore Deutschland

Casualties

NZ Report: Human Error to Blame for Rena Grounding

New Zealand's Transport Accident Investigation Commission (TAIC) published its final report into the grounding of containership Rena in October 2011. The TAIC’s

Report: Dire Conditions in Indian Shipbreaking Yards

Report by Indian research institute reveals poor enforcement of occupational health and safety provisions   The working and living conditions at the shipbreaking yards of Alang,

Wrecked Bulker’s Bow Refloated, Scuttled off S.Africa

TITAN Salvage, Crowley Maritime Corp.'s Houston-based marine salvage, emergency response and wreck removal company, has refloated and scuttled the largest section of the wrecked bulk carrier, Smart.

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1082 sec (9 req/sec)