Ship Removed from Reef, Sunk

Monday, August 08, 2005
HONOLULU - The 145-foot motor vessel Casitas, which ran aground at Pearl and Hermes Atoll on July 2, has been successfully extracted from the reef and entombed northwest of the atoll in approximately 7,200 feet of water, the Unified Command announced.

“On behalf of all the parties involved, we are very pleased to see this operation safely completed,” said U.S. Coast Guard Captain Manson Brown, Federal On-Scene Coordinator for the Unified Command. “The Unified Command shared a common commitment to remove the potential pollutants and extract the vessel from the reef with no human injuries and as little damage to the environment as possible. Given the remote location and the significance of the reef ecosystem, it was a challenge – a challenge we can now say we met.”

The Casitas was pulled off the reef at 11:31 a.m. Thursday morning. The operation began early in the morning as ballast water was pumped from the Casitas to refloat the vessel. Additional holes in the hull were patched and pumps were kept operating to keep the Casitas afloat until it reached an approved disposal site at approximately 1:35 p.m.

Earlier, approximately 1,850 gallons of gasoline were transferred from the Casitas to the 240-foot barge serving as the operations base for the extraction. Equipment and personal gear were also removed from the Casitas. Because of safety concerns, about 15 tons of marine debris and other trash were left on the vessel but stowed in sealed, double-hulled holds. Entombment of this type is not unusual.

The successful entombment of the Casitas ends this phase of the operation. In the near future, a team of representatives from State of Hawaii, National Oceanic and Atmospheric Administration, U.S. Fish and Wildlife Service, and responsible party will gather at Pearl and Hermes Atoll to begin assessing injuries to the atoll’s natural resources.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Pile Testing for Wikinger Wind Farm Launched

In October 2014 the first phase of the pile testing campaign for the Wikinger offshore wind farm project was launched after the site’s geotechnical investigation on the Baltic Sea had been completed.

Damen, Palfinger Upgrade North Sea Jack-Up Rig

With the support of Palfinger systems JUMP technology, Damen Shiprepair Vlissingen has completed an upgrade of a Keppel Fels ‘N’ Class drilling rig, one of the largest in the North Sea,

Vietnam Warship Visits Underscore Regional Tension

Vietnam on Tuesday showed off its two most powerful warships in the first-ever port call to the Philippines but an official said it was not trying to challenge

Casualties

Avoiding the Edges of the Sea

Mariners do best when they avoid the edges of the sea – the shoals, rocks, and other hard spots.  Coming into contact with the edges of the sea at other than a

Migrant Rescue Draws Budget Concerns in the Mediterranean

Seafarers’ Rights International (SRI) has raised concerns about the implications for masters of the recent reports of the launch of the new EU Frontex operation

USCG & Ocean Safety Rescue Kayakers on Molokini Crater

The Coast Guard and Ocean Safety rescued two kayakers trapped on Molokini Crater Monday. Watchstanders at Sector Honolulu Command Center received notification at 3:20 p.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1594 sec (6 req/sec)