Shipbuilding Clause to Shore Up Government Defense policy

Thursday, June 20, 2002
Senior Defense Minister Lord Bach told unions and MPs yesterday that a vital clause would be put on all future defense contracts guaranteeing that all sub contracting work will be done in the U.K. The move came after unions provided irrefutable evidence proving that Swan Hunters had blown a hole in the Government's promise that all warships would be built on the U.K. when, in fact, design and fabricated bow units for the Auxiliary Landing Ships was sent to Holland risking hundreds of jobs in Scotland. Unions belonging to the Confederation of Shipbuilding and Engineer Unions meeting in Glasgow today will demand that BAE Systems on the Clyde retain a design capacity guaranteeing 3000 jobs remaining at the two yards have a long term future. They will also press the Government to back plans to develop the super dry dock at Inch Green in Greenock to allow the Clyde to develop into commercial activity rather than relying on solely military contracts. John Wall, Amicus National Secretary, said: "Swan Hunter holed government policy on Shipbuilding below the water line when they took design work away from the centre of excellence on the Clyde and sent it to Holland where it had to be contracted out. "We very much welcome Lord Bach's response that a 'safeguarding clause' will be added to all future MoD contracts preventing repition. It is an example of the commitment from Government, employers and unions to retaining the Shipbuilding on the Clyde as an integrated design capable facility. "Without a design and development facility the Clyde has no long term future."

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Electronics

Wärtsilä REvolution system takes sealing technology to New Level

The new Wärtsilä REvolution system is a digital management system that controls, monitors, records and analyses the performance of seals autonomously in real time,

B&G Software Upgrade for Zeus2 and Vulcan Chartplotter

B&G, the world’s leading sailing navigation and instrument specialist has upgraded its latest software for the full range of Zeus2 and Vulcan chartplotters. The

KVH Promotes Bruun to COO

KVH Industries has  announced  that Brent Bruun, currently executive vice president of mobile broadband for the company, has been promoted to the newly created

Shipbuilding

India Govt, Cochin Shipyard Pact on FY17 Growth Targets

Cochin Shipyard Limited (CSL) has entered into a Memorandum of Understanding (MoU)  with the government of India for the ongoing fiscal under which targets agreed

Keel Laying for Russia's Second Nuclear Icebreaker

Today the Baltic Shipyard in St Petersburg (part of United Shipbuilding Corporation) laid the keel of Ural, Project 22220’s second series-produced nuclear icebreaker.

Russia: 6th Yasen-Class Nuclear Sub

Russia's sixth Yasen-class nuclear submarine will be laid down at the Sevmash ship-building company in the city of Severodvinsk on July 29, reports RIA Novosti.

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0656 sec (15 req/sec)