Shipyard Responsible For Poor Construction

Monday, July 19, 2004
The U.S. District Court for the Southern District of New York ruled that a shipyard is responsible under products liability for poor construction. In the instant case, the shipyard - South Korea's Hyundai Corporation - contracted to enlarge a container ship by fabricating and inserting a new mid-body. Thirteen years later, the ship broke in two during a storm at sea. The break occurred at the point where the new mid-body was joined to the original after-body. Evidence indicated that many of the welds connecting the two portions were bad and that the shipyard knew of the bad welds when the ship was redelivered to the owner. The court held that insertion of a new mid-body was a sale, rather than a repair. The court also held that privity was not required in a products liability case brought in admiralty (the ship having been sold between the time of redelivery and the time of the casualty). In the Matter of the Complaint of Rationis Enterprises, Inc., 97 Civ. 9052 (S.D.N.Y., HK Law).
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Vigor’s Tacoma Yard Delivers Breasting Barges to Foss

Vigor Industrial expands its newbuild capacity in Washington; Tacoma yard delivers three breasting barges   Fabrication teams at Vigor Industrial’s Tacoma, Wash.

New Milling Disc from IN.MOTION

IN.MOTION Technology Distribution, LLC, announced the launch of a new milling disc designed for fast, efficient beveling, weld preparation and weld repair. According to the manufacturer,

Newport News Shipbuilding Hosts Sen. Inhofe

Huntington Ingalls Industries (HII) today hosted Sen. James M. Inhofe, R-Okla., for a tour of the company's Newport News Shipbuilding division.   The senator,

Ports

Arctic Offshore Rig Gets USCG Escort

U.S. Coast Guard (USCG) crews escorted heavy lift ship Blue Marlin as it toted a controversial 38,000-metric-ton drilling rig into Port Angeles, Wash., Friday. Blue Marlin,

Icebreakers Ordered for Neft’s Novy Port Project

Aker Arctic’s icebreaker design selected for Gazprom Neft’s Novy Port project   Aker Arctic and Vyborg Shipyard have confirmed a contract for the design of two

MacGregor's Pusnes bow loading systems for Suezmax Tankers

MacGregor, part of Cargotec, has secured contracts to supply Pusnes bow loading systems for three newbuild shuttle tankers intended for operations in Brazilian waters.

 
 
Maritime Careers / Shipboard Positions Maritime Security Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1067 sec (9 req/sec)