Smedvig to Build New Semi-Tender

Friday, April 02, 2004
Smedvig has entered into an agreement with Keppel Shipyard in Singapore for the purpose of building a new semi-submersible self-erecting tender rig (semi-tender). Total capital expenditure for the new semi-tender is estimated at $ 94 million, of which Smedvig's share is approximately $ 29 million. The agreement with Keppel Shipyard is based on the principle that Keppel shall build and own the the semi-submersible hull, and Smedvig shall own the derrick equipment set. Smedvig shall for a period of ten years be responsible for marketing, management and operation of the unit. The agreement includes an option for Smedvig to purchase the semi-submersible hull during the ten-year period at a pre-agreed price. The new semi-tender will be based on a similar but improved design and specification as Smedvig's West Alliance. The new unit is targeted for deepwater drilling operations in combination with floating wellhead platforms such as TLPs and Spars in benign waters. The new rig is scheduled for delivery in the third quarter 2005. Kjell E Jacobsen, CEO in Smedvig asa says: "This investment reinforces our position as the leading tender rig operator."
Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Drydocks World to Participate in SMM 2014

Drydocks World, the leading provider of maritime and offshore services to the shipping, oil, gas, and energy sectors, will participate in the prestigious 26th edition of Shipbuilding,

SBM Offshore Completes Real Estate Divestment

SBM Offshore is pleased to announce that is has completed the sale and lease back of its Monaco real estate portfolio.  The last of the three buildings was sold

Keppel T & T Appoints Lim Chin Leong to its Board

Keppel Telecommunications & Transportation Ltd (Keppel T&T) has strengthened its Board with the appointment of Mr Lim Chin Leong as an independent, non-executive

Navy

RIMPAC Exercise Puts LCS Through Paces

It was the middle of May, and the littoral combat ship Independence was operating out of San Diego, testing components of the mine warfare mission package. The mission is one that,

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

General Dynamics Delivers North Dakota (SSN-784) to U.S. Navy

General Dynamics Electric Boat yestereday delivered the nuclear-powered attack submarine North Dakota (SSN-784) on time and more than $30 million below target cost.

 
 
Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1102 sec (9 req/sec)